Brazil's October HRC trade figures look like a turning point: exports of 20,800 mt against 2,300 mt in September, a 804% increase that dominated the headline. The number is arithmetically correct and analytically misleading. October's volume is still 21% below August's 26,400 mt, and the export book that produced it was worth about $12.0m at an average of $576/mt FOB — roughly $196/mt below September's implied unit value of $772/mt. Brazil did not recover its export market in October; it found a discounted outlet for material it could not place elsewhere.

The arithmetic behind the headline

MonthHRC exports (mt)HRC imports (mt)Net position (mt)
August26,40057,600−31,200
September2,30058,800−56,500
October20,80037,000−16,200

Source: Secex/MDIC data as reported by SteelOrbis. Net position is my calculation.

The 804% figure is measured against a September base depressed by the collapse of US sales after the Section 232 tariff moved to 50%. October's rebound restores roughly four-fifths of August's volume. What changed materially is the import side: inbound HRC fell 37% in volume and about $72/mt in price, cutting the monthly deficit from 56,500 mt to 16,200 mt. Brazil's apparent improvement is therefore driven more by foreign mills withdrawing than by Brazilian mills winning.

Three destinations, three different markets

DestinationVolume (mt)Price ($/mt FOB)Share of exports
US11,80068256.7%
Pakistan6,20036129.8%
Argentina2,80060913.5%

Source: Secex/MDIC via SteelOrbis. Shares are my calculation.

The US tranche is the strategically important one. At $682/mt FOB it clears the 50% Section 232 duty only because US domestic prices remain high enough to absorb it — this is quota-constrained, high-friction trade, and it will remain episodic as long as the tariff stands. The Argentina volume, at $609/mt, is ordinary Mercosur intra-regional business.

The Pakistan cargo is the anomaly. At $361/mt it sits 47% below the US price — far too wide a gap to explain by freight, payment terms or ordinary grade variation. This almost certainly reflects downgraded or off-spec material being cleared. A parallel Secex-based report on heavy plate for the same month shows Gerdau shipping 2,700 mt to Pakistan at $368/mt, explicitly described as downgraded, which supports that reading for the flat-rolled cargo as well. Treat the precise grade attribution for the HRC tonne as inference, not confirmed fact.

The exporter split tells you who is exposed

ArcelorMittal (11,800 mt), Gerdau (6,300 mt) and Usiminas (2,700 mt) sum exactly to the 20,800 mt total. The apparent firm-to-destination alignment — ArcelorMittal to the US, Gerdau to Pakistan, Usiminas to Argentina — is not one-to-one: Gerdau's volume exceeds the Pakistan cargo by 100 mt and Usiminas' falls 100 mt short of Argentina's. The alignment is plausible but should be treated as inference.

What is clear is concentration risk. ArcelorMittal alone accounted for more than half of October's exports, all of it into the tariff-constrained US channel. A single quota or licensing decision in Washington can move Brazil's national HRC export number by 50% or more in a month.

Imports: Asia retreats, but India stands out

OriginVolume (mt)Price ($/mt FOB)
Asia total35,700503
— of which India15,300565
— rest of Asia20,400456
Egypt1,300586

Source: Secex/MDIC via SteelOrbis. "Rest of Asia" is my calculation.

India supplied 41% of all Brazilian HRC imports in October, at $565/mt — $109/mt above the residual Asian average of $457/mt. That premium is large enough to suggest Indian tonnage is not directly competing with commodity Chinese or Vietnamese coil; it is more likely a specific grade, width or coating-adjacent product where Indian mills hold a niche. The collapse in Egyptian volume, from 19,800 mt in September at $647/mt to 1,300 mt at $586/mt, is the single largest contributor to the import decline and worth watching: Egypt has been a volatile but recurring supplier to Brazil.

What to watch

The October data should be read as a stress signal rather than a recovery. The export book cleared because Brazil accepted a 47% discount on nearly a third of its volume, and because the US channel briefly reopened. Neither is durable.

Three indicators matter for the next two to three months:

  • US quota utilisation and licensing pace. If October's 11,800 mt was a catch-up against accumulated quota, November will fall back sharply.
  • Whether Pakistan becomes a recurring outlet. A repeat of discounted volume in November would confirm it as a structural sink for off-spec Brazilian flat product, with implications for domestic quality discipline and for the realised price of Brazilian exports generally.
  • Whether Egypt returns. September's 19,800 mt at $647/mt and October's 1,300 mt at $586/mt are too large a swing to be normal commercial variation; either a shipment timing issue or a policy shift is at work.

The underlying truth of October is uncomfortable for Brazilian mills: they regained volume by discounting, not by competing.

Source & methodology +

MetalMate separates original-source evidence from summary and analysis. Verify the original source before procurement, legal or engineering decisions.

Article status
Published · Version 1
Source date
20 November 2026
MetalMate publication
20 November 2026
Verification
Automated evidence checks; not human reviewed

Brazilian HRC exports jump 804 percent in October as US buying resumes — SteelOrbis