Amplitude Energy's Annie-2 development well has turned in a better reservoir than the 2019 Annie-1 discovery delivered. The well reached 2,253 m measured depth on 28 October 2026, was cased and completed with a subsea tree, and cleaned up over 9–10 November. Preliminary results point to improved permeability, porosity and deliverability, with gas composition consistent with the original discovery. The well is now suspended for future development as part of the East Coast Supply Project (ECSP).

The headline flow figure — a peak surface-constrained rate of 58.8 MMscf/d through a 60/64-inch choke, with a stabilised average of 57.2 MMscf/d over an 8h20m main flow period and no observed pressure depletion — is large for a development well in the Otway Basin, but the phrase "surface-constrained" matters. Amplitude attributes the ceiling to test equipment rather than to the reservoir, meaning the well's true deliverability has not yet been established. Clean-up recovered 35.9 MMscf of gas and 37.1 bbl of condensate over roughly 18 hours, with no formation water.

The quantitative detail that circulated with the ASX release is worth tabulating against the original discovery, because the comparison is more nuanced than "better reservoir" suggests.

MetricAnnie-1 (2019 discovery)Annie-2 (2026 development)
Total depth—2,253 m MD
Gross pay, Waarre C~70 m gas column50 m gross pay
Net pay~62 m43.6 m
Net-to-gross~89%~87%
CO₂~7–8 mol%, no H₂S~7 mol%, no H₂S

Annie-1 figures from Cooper Energy's 2019 and 2020 ASX disclosures; Annie-2 figures as reported in the November 2026 release. Net-to-gross derived by MetalMate from the reported intervals.

The net-to-gross ratio is essentially unchanged, and the gross interval at Annie-2 is thinner than the column Annie-1 encountered. The improvement Amplitude is claiming is therefore about reservoir quality and flow capacity — permeability, porosity and deliverability — not about a thicker pay section. That distinction matters for resource estimates: better flow supports higher recovery per unit of rock and can support fewer wells, but it does not automatically translate into proportionally larger volumes.

What the resource numbers actually show

Annie's contingent resource has been revised several times since discovery. On a gross 2C basis it moved from 54.5 PJ (February 2020) to 57.4 PJ (August 2020) to 63.5 PJ (May 2022), and now sits at 65 PJ gross, or 32.4 PJ net to Amplitude's 50% interest alongside O.G. Energy. This lineage is a reminder that the pre-drill 65 PJ figure is itself the product of incremental technical work rather than a single static estimate; the current well results may support a further uplift, but no updated resource or reserve figure has been published yet. Amplitude has said reserve estimates for both Annie and Juliet are being worked over the coming weeks.

For scale, the ECSP — which combines the Annie, Juliet and Artisan fields — targets gross production of approximately 90 TJ/d from 2028 following the project's final investment decision and the sanctioning of the Nestor exploration well. Annie at 65 PJ gross is a meaningful but not dominant slice of that plan; the reserve upgrade, when it lands, will be the number that matters commercially.

The CO₂ arithmetic nobody has resolved

The consistency of gas composition is presented as a positive — it de-risks processing design — but consistency with Annie-1 also means consistency with roughly 7 mol% CO₂. That is well above typical Otway pipeline and plant specifications, and Amplitude's own FY25 resource summary anticipates Annie's CO₂ being "blended down" with lower-CO₂ gas from the wider hub.

The blending strategy is a real constraint, not a footnote. It ties Annie's producible volumes to the availability and CO₂ headroom of other hub gas and to the Athena Gas Plant's processing capacity. A high-deliverability well is valuable only to the extent the molecules can be processed and sold within specification. Readers should treat the 58.8 MMscf/d figure as a reservoir statement, not a sales-gas statement — the two are separated by the CO₂ issue.

What to watch

Two near-term data points will determine whether Annie-2 is a solid execution win or a genuine resource upgrade. First, the revised Annie and Juliet reserve estimates, due in the coming weeks, will show whether the improved permeability and deliverability translate into booked volumes. Second, the Transocean Equinox rig is now moving to the Nestor exploration prospect — the final well of the ECSP campaign — and success there would extend the campaign's upside beyond the development wells.

On execution, Amplitude reports the programme is ahead of schedule and under budget, with none of the general contingency budgeted for the ECSP drilling programme consumed to date. That is a favourable signal for a small-cap operator funding a multi-well campaign, though the cost discipline claim is company-attributed rather than independently verified.

One technical housekeeping note: trade reporting places Annie-2 in permit VIC/L37, while Amplitude's own environment-plan material references the earlier exploration permit (VIC/P44, with a minor extension into VIC/P76) for the original discovery. The shift in nomenclature most likely reflects a retention-licence or production-licence conversion, but that has not been documented in the material reviewed here, and readers tracking the asset should confirm the current title.

The bottom line: Annie-2 confirms that the Otway's Waarre C can flow gas at rates that comfortably support ECSP development economics, and it does so ahead of budget. The reservoir is better than feared. The open questions — how much of the resource converts to reserves, and how the ~7% CO₂ stream is blended into saleable gas — are the ones that will decide what the well is ultimately worth.

Source & methodology +

MetalMate separates original-source evidence from summary and analysis. Verify the original source before procurement, legal or engineering decisions.

Article status
Published · Version 1
Source date
11 November 2026
MetalMate publication
11 November 2026
Verification
Automated evidence checks; not human reviewed

Reservoir upside ups Amplitude Energy’s East Coast gas ante — Offshore Energy