According to POSCO, the companies will assess HyREX under varied, real-world raw-material conditions. Testing will examine how iron ore characteristics and quality affect process performance, with the aim of identifying optimal feedstock conditions and strengthening the basis for commercialization.
MetalMate summary of the linked evidenceCommercial context
The collaboration links iron ore selection directly to the development of hydrogen-based ironmaking. Demonstrating stable performance across different feedstock conditions could help reduce a key technical uncertainty ahead of commercialization.
MetalMate analysis- HyREX produces molten iron using hydrogen as the reducing agent instead of coal, according to POSCO.
- The agreement covers performance validation using BHP iron ore under different raw-material conditions.
- POSCO plans to test process stability and determine optimal ore conditions based on iron ore characteristics and quality.
- POSCO did not specify the agreement’s duration or value, supply volumes, testing schedule or a target date for HyREX commercialization.
Watch for test results showing HyREX’s stability with BHP ores, any defined feedstock specifications, and subsequent commercial-scale or supply arrangements. No validation results or commercialization timetable have yet been provided.
Source & methodology +
MetalMate separates original-source evidence from summary and analysis. Verify the original source before procurement, legal or engineering decisions.
- Article status
- Published · Version 1
- Source date
- Not supplied
- MetalMate publication
- 2 October 2026
- Verification
- Automated evidence checks; not human reviewed
포스코, 호주 원료공급사 BHP와 수소환원제철 협력 계약 체결 — POSCO Group Newsroom
MetalMate provides an English summary; consult the original wording.
