The arrival of a 500 m³ storage tank is, on its face, a modest construction milestone. But at the Port of Gothenburg it signals something structurally different from the LNG and bioLNG terminals that have preceded it: a plant designed to pull biomethane out of a national gas grid and turn it back into a liquid transport and bunker fuel. That is a different business model, and a harder one to run than a conventional liquefaction terminal tied to a single production site.
What has actually been built
Nordion Energi's plant at Skarvik 4 in the port's existing permitted energy-harbour area has now completed groundworks, foundations and base slabs. The tank — shipped in by vessel, close to 140 tonnes — is the first major process component in place. Wärtsilä holds the construction contract, awarded in June 2025.
| Parameter | Reported figure |
|---|---|
| Tank volume | 500 m³ |
| Tank weight | ~140 t |
| LBG storage capacity | up to 200 t |
| Annual output | ~250 GWh LBG |
| Daily output | ~50 t |
| Equivalent demand | ~500 trucks or 50 vessels per year |
| Grid connection | Direct to west Swedish gas grid (first in Sweden) |
| Target completion | Q2 2027 |
A simple sanity check on the tank: 200 tonnes in 500 m³ implies a density of about 400 kg/m³. That is at the low end of the 420–450 kg/m³ range typical of LNG at around −160 °C, but plausible for biomethane with a slightly higher methane content and a conservative design margin. Nothing here looks technically exotic.
The strategic point is the storage volume relative to throughput. At roughly 50 tonnes per day, the tank holds about four days of nameplate output. That is a working buffer sized for campaign bunkering and trailer loading, not a strategic reserve — a sensible, capital-efficient choice, but one that leaves little room for a liquefaction outage coinciding with a vessel call.
Why the grid connection matters more than the tank
Most European bioLNG capacity is sited at, or adjacent to, a single large anaerobic digester or a cluster of them. The Gothenburg design inverts this: biomethane already injected into the west Swedish grid by producers anywhere on the network is drawn off, cleaned and liquefied at the port. Nordion benefits from grid-scale aggregation and can switch between producers without building physical collection infrastructure.
That solves the geography problem — Sweden's biogas production is dispersed across agricultural regions that will never host a liquefaction plant — but it creates two others.
Feedstock competition. Biomethane in the grid is fungible, and Nordion's own figures put biogas at 39.3% of gas delivered in the west Sweden network in Q1 2025, against a company goal of 100% by 2030. Every megawatt-hour liquefied for a ship is an MWh that domestic gas customers cannot count as renewable. The plant effectively monetises the premium that maritime and heavy-transport users will pay over the grid's own green-gas value. If shipping's willingness to pay softens — for instance if the IMO's decarbonisation framework slips or if methanol and ammonia take a larger share of newbuild orders — the arbitrage narrows.
Energy penalty. Liquefaction consumes roughly 10–15% of the gas's energy content (my estimate, based on typical single-mix refrigerant cycles at this scale). The 250 GWh output figure therefore implies the plant draws meaningfully more than 250 GWh from the grid. That is normal, but it matters for the emissions accounting that underpins any FuelEU Maritime or IMO credit the end-user claims.
A schedule that has already moved
The Q2 2027 opening date deserves scrutiny, because the project has slipped steadily since the final investment decision (FID):
| Date | Stated completion |
|---|---|
| Dec 2024 (FID) | Autumn 2026 |
| Jun 2025 (Wärtsilä award) | Delivery Sep 2026; operation before end-2026 |
| Jun 2026 (port, construction start) | During 2027 |
| Nov 2026 (tank installed) | Q2 2027 |
| Nordion project page (undated) | "Early 2027" |
That is roughly six to nine months of drift, and the company's own project page still carries an earlier date than its November press release. Tank installation is a late-middle-stage milestone, not a commissioning one: piping, the cold box, compressors, control systems and grid interconnects remain. Reaching first LBG by Q2 2027 now looks feasible but not comfortable, and MetalMate would treat the date as a target rather than a commitment.
The demand side is the real test
St1 Biokraft has taken part of the capacity — an agreement dating back to March 2024, before FID — and has publicly targeted 6 TWh of biogas sales by 2030. The remainder is being marketed. That means a substantial share of 250 GWh is uncontracted at a point when the plant is perhaps 18 months from start-up.
This is the crux. Nordic shipping's LBG orderbook is real but thin: a handful of operators, notably on the Baltic and North Sea short-sea trades, have chosen dual-fuel LNG/LBG propulsion precisely because bioLNG is a drop-in with existing infrastructure. Those operators want guaranteed volumes and certificates, and they want bunkering where their vessels actually call. Gothenburg's advantage is that both producers and users already sit in the port — the port notes that several regular callers already run on LBG, currently sourced elsewhere.
The plant's role is therefore less about creating new demand than about capturing a supply chain that at present runs through imported and third-party volumes. Whether it succeeds depends on price and certification, not on steel in the ground.
What to watch
- Contract announcements filling the uncontracted capacity — the single best indicator of the plant's commercial viability ahead of start-up.
- Producer sign-ups to the west Sweden grid, including whether Nordion's 100%-biogas-by-2030 target holds once liquefaction begins absorbing volumes.
- Bunkering logistics: the design has historically included trailer loading and potential pipeline supply to a bunker facility; clarity on how ship deliveries will physically be executed is not yet public.
- Nordion's investment scale — Swedish press reported roughly SEK 250 million at FID. At that order of magnitude, unit economics are sensitive to utilisation; a slow ramp to nameplate output would hurt.
A 140-tonne tank is a symbol. The substantive question is whether a grid-fed, port-sited liquefier can compete for molecules and customers in a market where bioLNG supply is being built out across northern Europe in parallel. The next twelve months of contracting, not the next twelve months of construction, will answer it.
Source & methodology +
MetalMate separates original-source evidence from summary and analysis. Verify the original source before procurement, legal or engineering decisions.
- Article status
- Published · Version 1
- Source date
- 12 November 2026
- MetalMate publication
- 13 November 2026
- Verification
- Automated evidence checks; not human reviewed
Port of Gothenburg eyes large-scale biogas bunkering in 2027 — Offshore Energy
