ABS / Acciaierie Bertoli Safau: Danieli specialty-steel maker and forged products

public-source-reviewed; confirm works-specific certifications and procurement approvals

Last verified:

Italian mill profile of Acciaierie Bertoli Safau S.p.A. (ABS): corporate identity, production routes, product range and sourcing checks.

Italian mill profile of Acciaierie Bertoli Safau S.p.A. (ABS): corporate identity, production routes, product range and sourcing checks.

At a glance
Operating identityAcciaierie Bertoli Safau S.p.A. (ABS)
Main Italian production location(s)Cargnacco (Udine), Italy; Sisak, Croatia
Manufacturing roleSteelmaker and specialist producer of engineering steels, rolled and forged products
Last source review2026-10-11

Company identity and history

ABS is the steelmaking division of Danieli Group. Its official profile lists two production sites, Cargnacco in Italy and Sisak in Croatia; these should not be merged as one mill in an approved vendor list.

This company should be assessed as a specific operating manufacturer, not merely as a familiar brand name. Historical names and group affiliations may explain an old mill certificate without confirming that a different current site has equivalent approvals.

Main products and manufacturing role

Engineering steels, rolled bars, wire rod, billets and blooms, forged/rotoforged components and heat-treated products.

Manufacturing capability: ABS describes open/automatic forging, rotoforging and diverse grade families for engineering, automotive, oil and gas and power. Production routes and finished conditions vary by product and plant; no blanket approval should be inferred from parent Danieli branding.

For a complex steel order, the decisive questions are whether the entity melts steel, rolls it, forges it, manufactures tubes from purchased inputs, or performs subsequent finishing. Each activity can involve a different certifying legal entity and production works.

Certifications and project qualification

Public portfolios demonstrate products and manufacturing experience, but do not establish current EN 10204 certificate scope, CE/UKCA status, PED qualification, class approval, API license, client AVL entry, or acceptance for a specific project. These must be checked by exact operating works, product, grade, dimensions, standard edition and expiry date.

Do not treat a management-system certificate such as ISO 9001 as interchangeable with product or project approval.

Procurement takeaway

Confirm Italian versus Croatian melt and works on MTC, requested bar or forging route, heat treatment, ultrasonic testing, melt process and individual inspection plan.

What to check before an RFQ or PO

  • Exact manufacturer and legal name, melting works and production/finishing site.
  • Steel or alloy designation, product standard and edition, order dimensions and delivery condition.
  • MTC issuer and traceability to heat, ingot/billet or forging input.
  • Applicable EN 10204 certificate type, required NDT, Charpy/CTOD or other tests if specified.
  • Current manufacturing range, works-specific qualification and customer-approved-mill requirements.
  • Seller/trader identity versus actual producer and Incoterm.

Sources and verification references

ASK METALMATE

Ask MetalMate about this article

ABS / Acciaierie Bertoli Safau: Danieli specialty-steel maker and forged products

AI assistant · Responses are generated and can contain errors; verify specifications before acting.