MetalMate
← Knowledge library
Mills & Producers · Technical Guide

Duferco Travi e Profilati: ownership, products, manufacturing sites and procurement

Official public-source review 2026-10-11; individual works and approvals not audited

Last verified:

San Zeno EAF-to-beam production and the Duferdofin history

At a glanceDetail
CountryItaly
Company / identityDuferco Travi e Profilati
Principal product focusSteel beams, angles, channels and specialist rolled long profiles
Operating geography / facilitiesSan Zeno Naviglio, Pallanzeno, Giammoro; related divisions elsewhere
Last verified2026-10-11

Historical identity and background

Duferco documents the end of the Duferdofin–Nucor joint venture in 2020 and the subsequent DTP identity. Its Smart Beam Manufacturing mill was inaugurated in 2023 at San Zeno, integrating beam rolling with EAF steelmaking.

Corporate relationship and name distinctions

A historical MTC may show Duferdofin-Nucor; supplier approval should address historical and current producer identities.

Interpretation of the relationship: Duferco Group → Duferco Travi e Profilati (DTP), successor to Duferdofin-Nucor partnership ended 2020. This is a practical corporate identification summary, not a substitute for a current company-registry extract or the manufacturer's certificate.

Manufacturing footprint and product range

The SBM published target range includes HE 140–600, IPE 180–750, IPN 240–400 and UPN 80–300. These are facility range statements, not a guarantee of immediate commercial availability.

Practical identification: San Zeno Naviglio, Pallanzeno, Giammoro; related divisions elsewhere. Check the actual producing works and delivery condition; neither the head office nor the marketing brand alone identifies where a particular heat was melted and rolled.

Certifications, project approvals and documentation

A public portfolio or quality-certificate listing is not universal proof of qualification for EN 10225, EN 10025, EN 10210/10219, API 5L, PED or other contractual standards. The buyer should establish the relevant standard edition, grade, dimensions, manufacturing location, test scope, certificate validity and customer-specific AVL/AML conditions. Where a trader supplies the order, distinguish invoice issuer from the MTC manufacturer.

Procurement takeaway

For critical offshore/structural shapes request the producing works, grade, size, delivery condition, test certificates and current CE/FPC documentation if applicable.

What to confirm before RFQ or PO

  • Exact legal manufacturer, manufacturing site and seller, including historical names on existing stock certificates.
  • Product type and manufacturing process: primary melt, rolling, welded tube, seamless tube, finishing or stock processing.
  • Grade, dimensional range, delivery condition, inspection level and current production availability.
  • EN 10204 inspection document, heat identification, traceability and current product/works-specific approvals.
  • Commercial terms, country of melt-and-pour, CBAM-relevant documentation where applicable, and shipment origin.

References and verification sources

ASK METALMATE

Ask MetalMate about this article

Duferco Travi e Profilati: ownership, products, manufacturing sites and procurement

AI assistant · Responses are generated and can contain errors; verify specifications before acting.