MetalMate
← Knowledge library
Mills & Producers · Technical Guide

Galperti Group: manufacturing, products and procurement guide

public-source-reviewed; plant-specific approvals require re-verification

Last verified:

A buyer-focused profile of Galperti Group, including its manufacturing role, product range, corporate identity and verification considerations.

A buyer-focused profile of Galperti Group, including its manufacturing role, product range, corporate identity and verification considerations.

At a glance
Operating locationDervio, Gera Lario and Cercino, Lombardy; international plants
Manufacturing roleForgings and engineered-components manufacturer
Main product familiesForged flanges; open-die/closed-die forgings; rings; valves and connectors; critical energy components
Last reviewed2026-10-11

Identity and corporate relationships

Founded in 1921, the Italian group has developed a network of separate operating manufacturers. Corporate group identity is not a substitute for identifying which plant produced the specific forging.

For procurement purposes, the name of the commercial seller, actual manufacturing works and entity issuing the MTC may not be identical. Obtain this information when qualifying the material.

Products and manufacturing route

The group describes in-house forging, heat treatment and machining, including Italian facilities for flanges and specialist forged components. Galperti publishes material families covering carbon/alloy, stainless, duplex/superduplex and nickel alloys; exact grade, size and manufacturing route remain order-specific.

The manufacturing role matters: melting, plate rolling, coil-to-tube forming, forging and processing purchased material are different activities and do not grant equivalent mill approvals.

International standards and approvals

Standards mentioned in company catalogues indicate marketed product families, not proof of current site-specific certification for every grade and dimension. Obtain current certificates and their exact scopes for any EN, API, class, PED, CPR/FPC or customer approval cited in a tender. A general ISO 9001 certificate does not establish product approval.

Procurement takeaway

For offshore and oil-and-gas procurement specify forging route, ASTM/ASME or EN material standard, NACE requirements if relevant, UT/MT/PT, heat treatment, supplementary testing, EN 10204 3.1/3.2 as applicable, and exact plant/class approval.

Checks before RFQ or purchase order

  • Exact legal manufacturer, producing works, commercial seller and MTC issuer
  • Grade, standard and edition, manufacturing route and heat treatment
  • Size limits, delivery condition, Charpy/UT/NDT scope where applicable
  • EN 10204 inspection document type and product traceability
  • Current CE/CPR/PED/class/API certificate scope, if applicable
  • Customer/EPC approved-vendor status for the actual plant and product

References

ASK METALMATE

Ask MetalMate about this article

Galperti Group: manufacturing, products and procurement guide

AI assistant · Responses are generated and can contain errors; verify specifications before acting.