MetalMate
← Knowledge library
Mills & Producers · Technical Guide

HISTEEL: listed Korean welded steel-pipe producer and legal identity

Public official-source review (2026-10-11); works-specific approvals require re-verification

Last verified:

HISTEEL Co., Ltd. is a Korean listed pipe and hollow-profile manufacturer distinct from Husteel.

At a glanceDetail
CountrySouth Korea
ProducerHISTEEL
Main focusIron/steel pipes, tubes and hollow profiles; confirm current product-route catalogue
Production identityWorks-specific information requires fresh product verification
Last verified2026-10-11

Identity and company background

The Korean financial regulator’s company record identifies HISTEEL CO., LTD., founded in 2003, as a listed manufacturer of steel pipes, tubes and hollow profiles. The name resembles Husteel, but they are separate legal manufacturers; buyers should not merge their certifications or past offers. Publicly accessible current works-level technical specifications were not sufficiently established in this review to assert a specific SAW size range or API qualification.

Products and manufacturing footprint

Primary portfolio: Iron/steel pipes, tubes and hollow profiles; confirm current product-route catalogue.

Manufacturer/site check: Works-specific information requires fresh product verification. A group marketing brochure may aggregate multiple sites, processes or affiliates; it is not a substitute for a works-specific production list.

Certifications and project approvals

Do not infer a current works-specific API, ISO, EN/CE, class-society or end-customer AVL approval from an historic brochure or another subsidiary's certificate. Request valid documents that identify the legal entity, physical works, specific product, grades, diameter/thickness range and expiration date. Where no such current scope was independently corroborated, this article makes no approval claim.

Procurement takeaway

Before describing HISTEEL as a source for any particular large-diameter or offshore specification, obtain an official works catalogue, welding-process capability, current certifications and previous MTC specimen. The corporate identity is corroborated; product/approval detail needs additional confirmation.

What to reverify before an RFQ or PO

  • Exact legal manufacturer, works location and MTC issuer.
  • Current parent/subsidiary relationship, particularly after restructuring.
  • Product grade, dimensional standard, process route and size availability.
  • Manufacturing-site certification, license number, approved thickness/size and validity dates.
  • End-customer and EPC approved-vendor status for the specific project.
  • Seller/trader versus producer; traceable heat and coil/plate origin.

References and verification sources

ASK METALMATE

Ask MetalMate about this article

HISTEEL: listed Korean welded steel-pipe producer and legal identity

AI assistant · Responses are generated and can contain errors; verify specifications before acting.