MetalMate
← Knowledge library
Mills & Producers · Technical Guide

ILJIN Steel: seamless pipes, precision-drawn tubes and specialty tubular products

Public official-source review (2026-10-11); works-specific approvals require re-verification

Last verified:

ILJIN Steel is a separate Korean tube producer with hot seamless and precision cold-drawn capabilities.

At a glanceDetail
CountrySouth Korea
ProducerILJIN Steel
Main focusSeamless OCTG/line pipe, cold-drawn mechanical tubes, stainless tubes, precision shapes
Production identitySeamless production begun in 2012, according to company; check exact works
Last verified2026-10-11

Identity and company background

Founded in 1982, ILJIN Steel expanded from precision tube and cold-drawing operations into integrated seamless pipe production in 2012. Publicly listed end uses include OCTG, power generation, line pipe, hydraulic cylinder/mechanical tubes, automotive and stainless-tube applications. Its line-pipe description gives NPS 1–6 in and cites API 5L, EN and DNV-related standards; product dimensions and certification status are not universal.

Products and manufacturing footprint

Primary portfolio: Seamless OCTG/line pipe, cold-drawn mechanical tubes, stainless tubes, precision shapes.

Manufacturer/site check: Seamless production begun in 2012, according to company; check exact works. A group marketing brochure may aggregate multiple sites, processes or affiliates; it is not a substitute for a works-specific production list.

Certifications and project approvals

Do not infer a current works-specific API, ISO, EN/CE, class-society or end-customer AVL approval from an historic brochure or another subsidiary's certificate. Request valid documents that identify the legal entity, physical works, specific product, grades, diameter/thickness range and expiration date. Where no such current scope was independently corroborated, this article makes no approval claim.

Procurement takeaway

ILJIN is especially relevant where seamless small-diameter line pipe, mechanical seamless tube and cold drawing are needed. Verify the distinction between hot-finished seamless and subsequent cold-drawn tubing; specify NDT, pressure tests, tolerances, condition of supply and MTC scope.

What to reverify before an RFQ or PO

  • Exact legal manufacturer, works location and MTC issuer.
  • Current parent/subsidiary relationship, particularly after restructuring.
  • Product grade, dimensional standard, process route and size availability.
  • Manufacturing-site certification, license number, approved thickness/size and validity dates.
  • End-customer and EPC approved-vendor status for the specific project.
  • Seller/trader versus producer; traceable heat and coil/plate origin.

References and verification sources

ASK METALMATE

Ask MetalMate about this article

ILJIN Steel: seamless pipes, precision-drawn tubes and specialty tubular products

AI assistant · Responses are generated and can contain errors; verify specifications before acting.