MetalMate
← Knowledge library
Mills & Producers · Technical Guide

Jiangyin Xingcheng Special Steel: CITIC ownership, bars and heavy plate

Last verified:

The difference between the Xingcheng manufacturing works, its CITIC parent and sister producers.

The difference between the Xingcheng manufacturing works, its CITIC parent and sister producers.

At a glance
Operating locationJiangyin, Jiangsu
Main productsSpecial steel bars, wire rod, heavy/special plates, coil and engineering alloys
Profile typeOperating producer / group identity
Last verified2026-10-10

Ownership, naming and historical context

Xingcheng was established in 1993 as a joint venture involving CITIC Pacific and Jiangyin Steel Works. It is one of CITIC Pacific Special Steel’s named operating bases, not another name for CITIC Pacific or NISCO. The Xingcheng brand may appear on certificates while a CITIC group company signs the sales contract.

Products and manufacturing scope

Its official site describes eight bar, wire and plate/coil lines and states around 6.9 Mt/year of special-steel capacity. That figure is a works-level capability stated by the company, not the 2025 group crude-steel output. Confirm which route handles the quoted product.

Common confusion to avoid

A heavy-plate offer from a CITIC-related exporter is not proof of Xingcheng production; sister works produce different families.

Procurement takeaway

Confirm Xingcheng as MTC manufacturer, plant/site, melt and rolling origin, plate condition and approved dimension range. Do not transfer NISCO or TPCO approvals.

Practical mill-verification checklist

  • Exact registered Chinese/English producer name, plant address, MTC issuer and heat traceability.
  • Current parent, direct shareholder and historic names at relevant documentary dates.
  • Melt source, steelmaking/rolling route and the product actually made at that site.
  • Grade, size, heat-treatment and current product/certification scope for the exact works.
  • EPC/end-user qualification for the mill and specific product, not just group marketing.
  • Quotation issuer versus producer/exporter and certificate authenticity.

References and verification sources

ASK METALMATE

Ask MetalMate about this article

Jiangyin Xingcheng Special Steel: CITIC ownership, bars and heavy plate

AI assistant · Responses are generated and can contain errors; verify specifications before acting.