MetalMate
← Knowledge library
Mills & Producers · Technical Guide

Jingjiang Special Steel: the former VALIN Wuxi Steel within CITIC

Last verified:

Why the historic VALIN Wuxi Steel identity now appears within a CITIC operating group.

Why the historic VALIN Wuxi Steel identity now appears within a CITIC operating group.

At a glance
Operating locationJingjiang, Jiangsu
Main productsSpecial steel bars, forgings and industrial steel products; verify current works range
Profile typeOperating producer / group identity
Last verified2026-10-10

Ownership, naming and historical context

CITIC Pacific Special Steel’s official chronology says it acquired VALIN Wuxi Steel in 2018 and renamed it Jingjiang Special Steel. The historical Wuxi name is therefore a legitimate documentary clue, but not evidence that every company trading under “Wuxi” is this mill.

Products and manufacturing scope

This profile covers a specific former VALIN Wuxi operating works. Product categories and available standards must be confirmed by contemporary company technical documents, not inferred from the parent’s whole portfolio.

Common confusion to avoid

Avoid confusion with similarly named Wuxi stockists and trading companies. The previously deferred general “WUXI” sourcing topic remains outside this article.

Procurement takeaway

Cross-check historical MTC legal names and current plant identity, especially for older approvals and stock originating before the 2018 transition.

Practical mill-verification checklist

  • Exact registered Chinese/English producer name, plant address, MTC issuer and heat traceability.
  • Current parent, direct shareholder and historic names at relevant documentary dates.
  • Melt source, steelmaking/rolling route and the product actually made at that site.
  • Grade, size, heat-treatment and current product/certification scope for the exact works.
  • EPC/end-user qualification for the mill and specific product, not just group marketing.
  • Quotation issuer versus producer/exporter and certificate authenticity.

References and verification sources

ASK METALMATE

Ask MetalMate about this article

Jingjiang Special Steel: the former VALIN Wuxi Steel within CITIC

AI assistant · Responses are generated and can contain errors; verify specifications before acting.