MetalMate
← Knowledge library
Mills & Producers · Technical Guide

JISCO / Jiuquan Iron & Steel: regional group and stainless operations

Last verified:

Separating the Jiuquan group name from individual carbon and stainless production entities.

Separating the Jiuquan group name from individual carbon and stainless production entities.

At a glance
Location / operating footprintJiayuguan, Gansu, China
Reported scale8.49 Mt crude-steel output in 2025 (worldsteel: Jiuquan Steel)
Main product familiesCarbon hot-rolled products, plate/strip and stainless product lines; confirm by facility
Last verified2026-10-10

Ownership, historical names and corporate identity

JISCO and Jiuquan Steel are common abbreviations for the steel group based in Gansu. Purchasers may encounter variant names and subsidiary identities, so the group name by itself is not a complete manufacturer designation.

Products, works and manufacturing scope

The group is relevant to both conventional carbon-steel products and stainless supply chains. Processes, product standards and certifications differ across the business units. A stainless coil offer should not be treated as proof of seamless-pipe manufacture.

Common sourcing confusion

JISCO is separate from TISCO despite their similar-looking names and stainless portfolios.

Procurement takeaway

Verify actual works and company registration, grade and width/thickness limits, stainless process route, MTC issuer and current site-specific export qualifications.

What to reverify before an RFQ or PO

  • Exact legal manufacturer and registered Chinese name; works location and MTC issuer.
  • Historic names and dates relevant to existing stock or older approvals.
  • Product route and dimensional range at the quoted site, not at parent-group level.
  • Current ISO, class, API, CE/FPC or PED scope where applicable.
  • End-client/EPC approval for the exact site, grade and product.
  • Seller/exporter relationship to actual producer, heat traceability and certificate authenticity.

References and verification sources

ASK METALMATE

Ask MetalMate about this article

JISCO / Jiuquan Iron & Steel: regional group and stainless operations

AI assistant · Responses are generated and can contain errors; verify specifications before acting.