MetalMate
← Knowledge library
Manufacturing · Technical Guide

Ladle refining vs vacuum degassing (VD)

public-source-checked; licensed-standard confirmation required before publication

Last verified:

Why ladle-furnace refining and vacuum degassing are different secondary-metallurgy operations, what each is used for, and why a mill may use both.

Ladle refining and vacuum degassing are both secondary-metallurgy operations, but they are not the same process.

A mill can legitimately describe steel as ladle refined without that meaning it was vacuum degassed. For demanding grades, the route may include both operations.

Where secondary metallurgy fits

A simplified steelmaking route is:

EAF or BOF/LD converter → ladle treatment → optional vacuum treatment → continuous casting or ingot casting

The primary furnace makes the molten steel. Secondary metallurgy then adjusts the melt to achieve tighter chemistry, cleanliness, gas content and temperature control before casting.

What a ladle furnace does

A ladle furnace (LF) treats the steel while it remains in the ladle. Typical functions include:

  • reheating and temperature control;
  • alloy additions and chemistry adjustment;
  • homogenization through stirring;
  • desulfurization under suitable slag conditions;
  • inclusion control and flotation;
  • providing process time between primary steelmaking and casting.

The LF is therefore a highly flexible refining and temperature-management station.

A statement such as “ladle refined” tells you that the steel received secondary treatment in the ladle, but it does not by itself tell you the dissolved hydrogen level or prove that vacuum treatment took place.

What vacuum degassing does

Vacuum degassing exposes molten steel to reduced pressure. The lower pressure promotes removal of dissolved gases and enables other refining reactions.

VD-type equipment is used, depending on process design, for functions including:

  • hydrogen reduction;
  • nitrogen reduction;
  • oxygen/carbon control;
  • decarburization in suitable routes;
  • sulfur reduction in some processes;
  • production of steel with demanding cleanliness or gas-content requirements.

Other vacuum routes include RH circulation degassing and specialized variants such as VD-OB or VOD.

The exact metallurgy depends on the grade and plant configuration, so “VD” should not be treated as a universal recipe with identical results at every mill.

LF and VD are often complementary

A demanding route may look approximately like:

primary furnace → LF → VD/RH → casting

For example, the ladle furnace may establish chemistry and temperature while the vacuum stage is used to reduce hydrogen and other dissolved gases.

That is why the statements:

  • “ladle refined”; and
  • “vacuum degassed”

should be recorded separately in a mill capability review.

Why vacuum treatment can matter for heavy steel products

Hydrogen is particularly important in thick and highly restrained products because excessive hydrogen can contribute to internal defects and delayed cracking mechanisms.

Projects involving heavy plate, forgings, offshore steel, pressure equipment or highly demanding mechanical-property requirements may therefore impose steelmaking or vacuum-treatment requirements beyond the basic grade designation.

But the requirement must come from the governing standard or project specification. It should not be assumed that every S355, S460 or alloy grade automatically requires VD.

Cost and lead-time implications

Vacuum treatment is an additional production step requiring specialized equipment and processing time. It can affect:

  • mill routing;
  • available producers;
  • minimum order quantity;
  • campaign planning;
  • cost;
  • lead time.

For procurement, a mill that can make the chemistry but lacks the required secondary-metallurgy route may still be technically unacceptable.

What to ask a mill

Instead of asking only “Is the steel refined?”, ask specifically:

  • EAF or BOF/LD primary route?
  • Ladle furnace (LF) used?
  • Vacuum degassing used?
  • Which vacuum process: VD, RH, VOD or another route?
  • Is vacuum treatment standard for this grade or only on request?
  • Are maximum hydrogen or other gas limits specified and reported?
  • Is the steel killed and fine-grain treated as required?
  • Are steelmaking-route details stated on the MTC or manufacturing procedure?

Procurement takeaway

Ladle refining is not the same as vacuum degassing.

LF mainly provides controlled secondary refining, alloying, slag treatment and temperature management. Vacuum degassing uses reduced pressure to achieve additional control of dissolved gases and other metallurgical objectives.

If a project specifically requires vacuum-degassed steel, a generic statement such as “ladle refined” is not sufficient evidence.

References and verification sources

ASK METALMATE

Ask MetalMate about this article

Ladle refining vs vacuum degassing (VD)

AI assistant · Responses are generated and can contain errors; verify specifications before acting.