MetalMate
← Knowledge library
Mills & Producers · Technical Guide

Linzhou Fengbao Pipe Industry: what the Henan Fengbao seamless mill produces

public-source review; current corporate registers and certificate scopes require re-verification

Last verified:

An independent seamless-pipe producer with an oil-and-gas, pressure and structural-tube focus.

An independent seamless-pipe producer with an oil-and-gas, pressure and structural-tube focus.

At a glance
Location / main baseLinzhou, Henan
Ownership / structureFengbao pipe-manufacturing business; verify current legal ownership
2025 output / scale1.2 Mt/year seamless pipe capacity claimed by company
Main productsSeamless OCTG, line pipe, sour-service and structural pipe
Last verified2026-10-08

Henan Fengbao is often used informally in RFQs for the operation formally marketed as Linzhou Fengbao Pipe Industry Co., Ltd. Its identity matters because buyers may otherwise confuse an exporter, a holding or sales organization and the actual seamless-pipe manufacturer.

Manufacturing background

The company describes an integrated operation covering ironmaking, steelmaking, pipe rolling, heat treatment and finishing. Its official commercial site states 1.2 million tonnes/year seamless-pipe capacity, alongside 2 million tonnes/year iron/steel capacity and 150,000 tonnes/year finished OCTG capacity. These are stated capacity figures, not independently audited annual production.

Product families

The producer advertises carbon-steel seamless casing and tubing, API line pipe including PSL1/PSL2, sour-service line pipe and structural tubes. Representative marketed grades include API 5L B, X42, X52, X60 and X70 and API 5CT J55, K55, N80, L80 and P110. Grade names alone are not evidence that a specific PO meets the project standard edition, tests or delivery condition.

Procurement and approvals

For line pipe, check API 5L license validity and confirm PSL2 or sour-service requirements line by line. For structural use, demand precise EN 10210 and EN 10204 documentation if the client specifies those standards. Where an exporter uses 'Fengbao International', establish whether it is an export channel and whether Linzhou Fengbao appears as manufacturer on the MTC.

Procurement takeaway

Fengbao can be a relevant seamless-pipe RFQ candidate, but project approval, suitable OD/WT, CVN temperature, NDT and traceability all remain order-specific.

What to reverify before an RFQ or PO

  • Exact legal manufacturer, works and MTC issuer; do not rely on a group or export-trader name alone.
  • Current ownership, name changes and the legal entity named on original certificates.
  • Product-by-product manufacturing route, grade, OD/thickness or section range, heat treatment and available tests.
  • Valid ISO, API, class-society, CE/FPC, PED or other certificates for the exact works and scope, where relevant.
  • Current EPC/customer approved-vendor status, which is not established by generic marketing claims.
  • Seller/export company versus actual manufacturer, and EN 10204 certificate availability.

References and verification sources

ASK METALMATE

Ask MetalMate about this article

Linzhou Fengbao Pipe Industry: what the Henan Fengbao seamless mill produces

AI assistant · Responses are generated and can contain errors; verify specifications before acting.