MetalMate
← Knowledge library
Mills & Producers · Technical Guide

POSCO: Pohang and Gwangyang steelworks, products and sourcing

public-source-checked (KR-01 batch); verify current ownership, plant scope and works-specific certifications before a tender or contract.

Last verified:

Pohang and Gwangyang steelworks, products and sourcing

Pohang and Gwangyang steelworks, products and sourcing.

At a glance
IdentityIntegrated steel producer
CountrySouth Korea
Main commercial relevancePohang and Gwangyang steelworks, products and sourcing
Last verified2026-10-11

Ownership, names and history

POSCO operates the major integrated steelworks at Pohang and Gwangyang. In documentation, the producing works matters as much as the brand.

Products and manufacturing capability

The product system includes heavy plate, hot- and cold-rolled flat products, electrical steel, stainless-related product families and wire rod. Available products and sizes depend on the individual works and line.

What this means for buyers

For plate procurements, request the precise plate mill, manufacturing route, relevant class or project approvals, applicable testing conditions, and mill test certificate samples.

Common confusion to avoid

The POSCO name may appear on quotations through sellers or affiliates; trace the heat to the original producing works.

Practical procurement checklist

  • Identify the exact legal manufacturer, producing works, seller and mill-test-certificate issuer.
  • Confirm the offered grade, dimensions, processing route, heat treatment and testing requirements for that works.
  • Obtain current product-/works-specific certificates and confirm expiry and grade/thickness scope.
  • Verify project or end-user AML/AVL separately: a group affiliation never transfers approval automatically.
  • Distinguish stated annual capacity, reported crude-steel output and shipment figures.
  • Check whether historical names on stock MTCs match the manufacturer at the time of production.

References and verification sources

ASK METALMATE

Ask MetalMate about this article

POSCO: Pohang and Gwangyang steelworks, products and sourcing

AI assistant · Responses are generated and can contain errors; verify specifications before acting.