MetalMate
← Knowledge library
Mills & Producers · Technical Guide

Profilmec Group: manufacturing, products and procurement guide

public-source-reviewed; plant-specific approvals require re-verification

Last verified:

A buyer-focused profile of Profilmec Group, including its manufacturing role, product range, corporate identity and verification considerations.

A buyer-focused profile of Profilmec Group, including its manufacturing role, product range, corporate identity and verification considerations.

At a glance
Operating locationTurin / Racconigi and other Italian sites
Manufacturing rolePrecision welded-tube and special-profile manufacturer
Main product familiesCold-formed HFW welded thin-wall tubes; precision shapes; automotive and industrial sections
Last reviewed2026-10-11

Identity and corporate relationships

Profilmec is a group rather than a single undifferentiated manufacturer. The public group profile names multiple companies and facilities; the MTC issuer and producing plant should be separately identified.

For procurement purposes, the name of the commercial seller, actual manufacturing works and entity issuing the MTC may not be identical. Obtain this information when qualifying the material.

Products and manufacturing route

Its published core range focuses on HF-welded precision tube, generally thin-wall products from slit coil for automotive, transport, furniture and industrial use. It does not present itself as a heavy offshore-section mill.

The manufacturing role matters: melting, plate rolling, coil-to-tube forming, forging and processing purchased material are different activities and do not grant equivalent mill approvals.

International standards and approvals

Standards mentioned in company catalogues indicate marketed product families, not proof of current site-specific certification for every grade and dimension. Obtain current certificates and their exact scopes for any EN, API, class, PED, CPR/FPC or customer approval cited in a tender. A general ISO 9001 certificate does not establish product approval.

Procurement takeaway

For buyers distinguish thin-wall engineered tube from EN 10210 structural hollow sections, verify the exact operating entity, material condition, weld process and dimensional tolerances, and do not assume oil-and-gas approval from automotive-system certifications.

Checks before RFQ or purchase order

  • Exact legal manufacturer, producing works, commercial seller and MTC issuer
  • Grade, standard and edition, manufacturing route and heat treatment
  • Size limits, delivery condition, Charpy/UT/NDT scope where applicable
  • EN 10204 inspection document type and product traceability
  • Current CE/CPR/PED/class/API certificate scope, if applicable
  • Customer/EPC approved-vendor status for the actual plant and product

References

ASK METALMATE

Ask MetalMate about this article

Profilmec Group: manufacturing, products and procurement guide

AI assistant · Responses are generated and can contain errors; verify specifications before acting.