MetalMate
← Knowledge library
Mills & Producers · Technical Guide

Rizhao Steel Holding Group: independent Rizhao producer, products and certifications

public-source-checked; ownership, capacity, certificates and customer approvals require periodic re-verification

Last verified:

A profile of independent Rizhao Steel Holding Group, its scale, ESP/coil and H-section products, and its distinction from Shandong Steel Rizhao.

A profile of independent Rizhao Steel Holding Group, its scale, ESP/coil and H-section products, and its distinction from Shandong Steel Rizhao.

At a glance
Headquarters / worksRizhao, Shandong
Ownership characterPrivate / independent group
Compliant steelmaking capacity stated by company21.48 Mt
2025 crude steel output17.04 Mt — worldsteel
Main productsESP/hot-rolled coil, galvanized products, H-sections, wire rod, bar, automotive steel
Last verified2026-10-07

Rizhao Steel Holding Group Co., Ltd. is a large independent steel group in Rizhao. It must not be confused with Shandong Steel's separate Rizhao company.

Scale and history

Rizhao Steel states it started construction/production in 2003 and reached ten-million-tonne scale by 2008. Its current official profile states 21.48 Mt of compliant steelmaking capacity. worldsteel reports 17.04 Mt crude steel output in 2025.

Product range

Rizhao Steel is especially strong in ESP hot-rolled coil, conventional hot-rolled coil, pickled/galvanized products, automotive and weathering steel, H-sections, wire rod and bar.

H-section certifications

The company's H-section information cites CCS, Korean KS, Australian ACRS, Hong Kong steel-pile certification and European certification for relevant products. Current validity and exact product scope must still be checked.

European and environmental documentation

The company has documented EN 10025 / CE-related certification history and published EPDs for some hot-rolled and H-section products. EPDs are environmental documents; they do not replace MTC or product certification.

Procurement takeaway

Rizhao Steel Holding is independent from Shandong Steel Rizhao. The shared city name is the source of the confusion.

What to reverify before an RFQ or PO

  • exact legal manufacturer and works;
  • current parent/ownership structure where relevant;
  • current production range and size limits;
  • ISO/API/class/CE/PED/FPC certificate scope and validity;
  • current customer/EPC AVL/AML approval;
  • seller/trading entity versus MTC issuer.

References and verification sources

ASK METALMATE

Ask MetalMate about this article

Rizhao Steel Holding Group: independent Rizhao producer, products and certifications

AI assistant · Responses are generated and can contain errors; verify specifications before acting.