MetalMate
← Knowledge library
Mills & Producers · Technical Guide

Wuyang Iron & Steel / Wugang: HBIS heavy-plate specialist, products and offshore approvals

public-source-checked; ownership, capacity, certificates and customer approvals require periodic re-verification

Last verified:

A buyer-focused profile of Wuyang/Wugang, HBIS's specialist wide and heavy plate producer, including offshore/API product ranges and class approvals.

A buyer-focused profile of Wuyang/Wugang, HBIS's specialist wide and heavy plate producer, including offshore/API product ranges and class approvals.

At a glance
LocationHenan
Parent groupHBIS
Annual steel capability stated by mill~5 Mt
Wide/heavy plate capability stated by mill~3 Mt/year
ProductsOffshore, shipbuilding, pressure vessel, energy, bridge, pipeline, nuclear and high-strength plate
Last verified2026-10-07

Wuyang Iron & Steel Co., Ltd., commonly called Wuyang Steel or Wugang, is one of China's best-known specialist producers of wide and heavy plate.

Production capability

Wuyang's official profile states approximately 5 Mt/year steel production and 3 Mt/year wide and thick plate. The works includes converter and electric-furnace steelmaking, refining/vacuum treatment, ingot and continuous casting, large plate mills and plate heat-treatment facilities.

Main product families

Wuyang lists plate for offshore/shipbuilding, pressure vessels, Cr-Mo and hydrogen service, nuclear, bridges, pipelines, high-strength and wear-resistant applications, low-temperature service and clad/mould applications.

Offshore/API capability

The public range includes examples such as API 2H Grades 42/50, API 2W Grades 50/60, API 2Y Grades 50/60 and EN offshore grades including S355MLO, S420MLO and S460MLO. Standard edition and thickness range must be confirmed for each order.

Classification-society approvals

Wuyang publicly lists approvals involving CCS, DNV, LR, BV, ABS, ClassNK, KR and RINA for relevant marine/offshore products. These approvals are product-, grade-, thickness- and date-specific.

Procurement takeaway

HBIS = parent group; Wuyang/Wugang = specialist heavy-plate mill. For an offshore tender, verify Wuyang itself on the current AVL and class/API scope rather than relying on generic HBIS approval.

What to reverify before an RFQ or PO

  • exact legal manufacturer and works;
  • current parent/ownership structure where relevant;
  • current production range and size limits;
  • ISO/API/class/CE/PED/FPC certificate scope and validity;
  • current customer/EPC AVL/AML approval;
  • seller/trading entity versus MTC issuer.

References and verification sources

ASK METALMATE

Ask MetalMate about this article

Wuyang Iron & Steel / Wugang: HBIS heavy-plate specialist, products and offshore approvals

AI assistant · Responses are generated and can contain errors; verify specifications before acting.