MetalMate
← Knowledge library
Mills & Producers · Technical Guide

Xinyu Iron & Steel / XISCO: Baowu relationship and plate capabilities

Last verified:

Identifying Xinyu (XISCO) within Baowu without confusing it with Baosteel.

Identifying Xinyu (XISCO) within Baowu without confusing it with Baosteel.

At a glance
Location / operating footprintXinyu, Jiangxi, China
Reported scaleNo standalone worldsteel 2025 top-50 tonnage shown for Xinyu; production is distinct from parent-group reported output
Main product familiesPlate, hot-rolled and related steel products; grade and thickness scope requires works confirmation
Last verified2026-10-10

Ownership, historical names and corporate identity

Xinyu, often called Xinsteel or XISCO, is a separate listed steel producer and should not be called Baoshan Iron & Steel merely because it is within the wider Baowu system. Public 2025 annual-report ownership information identifies a Baowu holding in Xinyu Iron & Steel.

Products, works and manufacturing scope

The mill identity is relevant when evaluating heavy and medium plate, but manufacturing limits, rolling/heat-treatment facilities and marine/offshore approval require current mill documentation. Do not infer specific offshore grades from group descriptions.

Common sourcing confusion

Xinyu/Xinsteel/XISCO are market names of a different operating producer from Baosteel or Magang; MTCs and project approvals must be independently evaluated.

Procurement takeaway

For thick plate and fabrication projects, request legal plant, slab source, plate rolling and heat-treatment sites, UT class, thickness limits and grade-specific MTCs.

What to reverify before an RFQ or PO

  • Exact legal manufacturer and registered Chinese name; works location and MTC issuer.
  • Historic names and dates relevant to existing stock or older approvals.
  • Product route and dimensional range at the quoted site, not at parent-group level.
  • Current ISO, class, API, CE/FPC or PED scope where applicable.
  • End-client/EPC approval for the exact site, grade and product.
  • Seller/exporter relationship to actual producer, heat traceability and certificate authenticity.

References and verification sources

ASK METALMATE

Ask MetalMate about this article

Xinyu Iron & Steel / XISCO: Baowu relationship and plate capabilities

AI assistant · Responses are generated and can contain errors; verify specifications before acting.