MetalMate.AI
MARKETS / PRICES & INDICATORS

The indicators behind the market.

Dated market observations from named sources. Historical assessments and surcharges, not live quotes.

7 of 7 observations

Available market observations. Expand a product for its summary and source details.
ProductRegionGrade / categoryPriceBasisObservation dateSource
Heavy plate 8–40 mm

Fastmarkets assessed Southern European domestic plate at EUR 740–760/t EXW on 3 September. Higher slab costs and limited October availability supported the increase.

Source published: 10 September 2026

European domestic steel heavy plate prices rise on higher slab costs, tighter material availability
Southern EuropeBase-grade / S235 reference740–760 EUR/tEXWEUROMETAL / Fastmarkets
Heavy plate 8–40 mm

Fastmarkets assessed Northern European domestic plate at EUR 850–875/t EXW on 3 September amid tight spot availability and project-related mill demand.

Source published: 10 September 2026

European domestic steel heavy plate prices rise on higher slab costs, tighter material availability
Northern EuropeBase-grade plate850–875 EUR/tEXWEUROMETAL / Fastmarkets
Heavy plate

Kallanish reported S275 at about EUR 740/t EXW and an S355 premium of approximately EUR 20/t. EUR 760/t is the resulting indicative S355 level, not a separately quoted assessment.

Source published: 12 September 2026

Italian plate prices tick up on improved demand
ItalyS355≈760 EUR/tEXWEUROMETAL / Kallanish
Steel slab

Fastmarkets assessed slab imports into Italy at USD 560–580/t CIF on 3 September. Higher import costs added pressure to re-rolled plate pricing.

Source published: 10 September 2026

European domestic steel heavy plate prices rise on higher slab costs, tighter material availability
ItalyImport slab560–580 USD/tCIF ItalyEUROMETAL / Fastmarkets
Hot-rolled coil

Achievable Northwest European HRC levels were reported at EUR 730–760/t EXW for the week ending 28 August. Tighter imports supported domestic demand.

Source published: 31 August 2026

European coil and green steel round-up: EU coil price rise to resume in September
Northwest EuropeHRC730–760 EUR/tEXWEUROMETAL / McCloskey by OPIS
Stainless flat products alloy surcharge

September 2026 alloy surcharge for 1.4404 / 316L in the source’s Sheets (Bleche) category. This is an alloy surcharge only, not a full material price.

Alloy surcharges
Europe1.4404 / 316L4.04 EUR/kgAlloy surcharge — Sheets / BlechePeriod start · September 2026preschstahl
Duplex flat products alloy surcharge

September 2026 alloy surcharge for 1.4462 / Duplex 2205 in the source’s Sheets (Bleche) category. This is an alloy surcharge only, not a full material price.

Alloy surcharges
Europe1.4462 / Duplex 22053.94 EUR/kgAlloy surcharge — Sheets / BlechePeriod start · September 2026preschstahl