Middle EastConstruction / fabrication
ADNOC's West-East Pipeline: The Hormuz Bypass That Adds 1.5 Million b/d of Chokepoint-Free Export Capacity
ADNOC's ~520 km West-East Pipeline from Jebel Dhanna to Fujairah is under construction for a 2027 start-up, aiming to roughly double crude export capacity through a route that avoids the Strait of Hormuz — with CPECC, ENPPI, Bin Asheer and Everest already at work on a 48-inch system.
