Forta DX 2205
Outokumpu identifies Forta DX 2205 as EN 1.4462, a duplex stainless product combining corrosion resistance and high mechanical strength. Product-specific requirements still need confirmation.
- Material family
- Duplex stainless steel
- Search designations
- 1.4462 · 2205
- Verification scope
- Manufacturer-source identification check only. No standard-compliance or numerical-property verification.
- Last source check
- 2026-09-20
Before specifying this material
- Confirm the product standard, edition, dimensions and delivery condition before purchase.
- Aliases help locate candidates; they are not a declaration of full equivalence.
- Numerical properties have not been curated for this record. No universal strength or chemistry values are implied.
Governing standard/part/edition, product form, heat treatment, dimensions and supplementary requirements have not been selected. No numerical chemistry, yield, tensile, elongation, impact or carbon-equivalent requirements are asserted by this identification record.
Original sources
Outokumpu Forta range ↗
English · checked 2026-09-20
