MetalMate
STRUCTURED REFERENCE

Metal Grade Guide

Resolve a material by designation, material number or common alias, then open its pre-generated Grade Report. Reports are generated during research, not on page load.

Specified/normative values are distinguished from typical, manufacturer, calculated and inferred values on every report. Cross-standard comparisons are not declarations of equivalence. Confirm the standard, product form and condition before purchase.

10CrMo9-10 · 1.7380

low-alloy chromium-molybdenum steel for pressure equipment at elevated temperature

Open grade report →

13CrMo4-5 · 1.7335

low-alloy chromium-molybdenum steel for pressure equipment and elevated-temperature service

Open grade report →

16Mo3 · 1.5415

molybdenum-alloyed ferritic steel for pressure purposes with specified elevated-temperature properties

Open grade report →

17-4 PH · UNS S17400

martensitic precipitation-hardening stainless steel

Open grade report →

34CrNiMo6 · 1.6582

cr-ni-mo alloy special steel for quenching and tempering

Open grade report →

42CrMo4 · 1.7225

chromium-molybdenum alloy special steel for quenching and tempering

Open grade report →

904L · UNS N08904

high-alloy, low-carbon super-austenitic stainless steel

Open grade report →

AH36

higher-strength, fine-grain carbon-manganese hull structural steel

Open grade report →

API 2H Grade 50

intermediate-strength carbon-manganese offshore structural steel plate

Open grade report →

API 2W Grade 50

tmcp high-strength low-alloy structural steel plate for offshore structures

Open grade report →

API 5L X42

carbon and low-alloy high-strength steel line pipe

Open grade report →

API 5L X52

high-strength low-alloy carbon steel line pipe

Open grade report →

API 5L X60

high-strength carbon–manganese and microalloyed steel line pipe

Open grade report →

API 5L X65

high-strength low-alloy carbon-manganese steel line pipe

Open grade report →

API 5L X70

high-strength low-alloy carbon steel line pipe

Open grade report →

API 5L X80

high-strength low-alloy carbon steel line pipe

Open grade report →

ASTM A106 Grade B · UNS K03006

seamless carbon steel pressure pipe for high-temperature service

Open grade report →

ASTM A252 Grade 3

carbon steel pipe piling

Open grade report →

ASTM A36/A36M

weldable carbon structural steel

Open grade report →

ASTM A387 Grade 11 Class 2 · UNS K11789

chromium-molybdenum low-alloy pressure-vessel steel plate for elevated-temperature service

Open grade report →

ASTM A387 Grade 22 Class 2 · UNS K21590

chromium-molybdenum low-alloy pressure-vessel steel plate

Open grade report →

ASTM A387/A387M Grade 91 Class 2

creep-strength-enhanced ferritic/martensitic 9cr-1mo-v-nb alloy steel pressure-vessel plate

Open grade report →

ASTM A514 Grade Q

high-yield-strength quenched-and-tempered alloy structural steel plate

Open grade report →

ASTM A515 Grade 60

killed carbon-silicon pressure-vessel steel plate for intermediate- and higher-temperature service

Open grade report →

ASTM A515 Grade 65

killed carbon-silicon pressure-vessel steel plate for intermediate- and higher-temperature service

Open grade report →

ASTM A515 Grade 70 · UNS K03101

killed coarse-grain carbon-silicon pressure-vessel plate steel

Open grade report →

ASTM A516 Grade 55

killed, fine-grain carbon steel plate for welded pressure vessels

Open grade report →

ASTM A516 Grade 60

killed, fine-grain carbon steel pressure-vessel plate

Open grade report →

ASTM A516 Grade 65

killed, fine-grain carbon steel plate for welded pressure vessels

Open grade report →

ASTM A516 Grade 70

killed, fine-grain carbon-manganese pressure-vessel steel plate

Open grade report →

ASTM A572 Grade 42

high-strength low-alloy (hsla), microalloyed structural steel

Open grade report →

ASTM A572 Grade 60

high-strength low-alloy (hsla) structural steel

Open grade report →

ASTM A572 Grade 65

high-strength low-alloy (hsla), microalloyed structural steel

Open grade report →

ASTM A572/A572M Grade 50

high-strength low-alloy (hsla) structural steel

Open grade report →

ASTM A588 Grade A

high-strength low-alloy atmospheric-corrosion-resistant structural steel

Open grade report →

ASTM A709 Grade HPS 70W

high-performance, high-strength low-alloy weathering structural steel for bridges

Open grade report →

ASTM A709/A709M Grade 50W

high-strength low-alloy weathering structural steel for bridges

Open grade report →

ASTM A992/A992M-22

weldable carbon-manganese structural steel for hot-rolled shapes

Open grade report →

DH36

higher-strength weldable carbon-manganese hull structural steel

Open grade report →

EH36

higher-strength, fine-grain weldable hull structural steel

Open grade report →

Grade A

weldable ordinary-strength carbon-manganese hull structural steel

Open grade report →

Grade D

weldable ordinary-strength carbon-manganese hull structural steel

Open grade report →

M270-35A · 1.0801

cold-rolled non-oriented electrical steel, fully processed

Open grade report →

P265GH · 1.0425

non-alloy quality steel for pressure equipment with specified elevated-temperature properties

Open grade report →

P355GH · 1.0473

non-alloy carbon-manganese pressure-vessel steel with specified elevated-temperature properties

Open grade report →

P355NH · 1.0565

weldable normalized fine-grain steel for pressure equipment with specified elevated-temperature proof strength

Open grade report →

Q235B

non-alloy carbon structural steel

Open grade report →

Q345R

manganese-alloyed pressure-equipment steel plate and strip

Open grade report →

Q355B

high-strength low-alloy structural steel

Open grade report →

Q355C

hot-rolled high-strength low-alloy structural steel

Open grade report →

Q355D

high-strength low-alloy structural steel

Open grade report →

Q355E

low-alloy high-strength structural steel with specified low-temperature impact toughness

Open grade report →

Q420D

low-alloy high-strength structural steel (hsla)

Open grade report →

Q460D

high-strength low-alloy structural steel

Open grade report →

Q690D

690 mpa-class high-strength low-alloy structural steel; designation may refer historically to either tmcp structural-ste

Open grade report →

Q690E

690 mpa-class high-strength low-alloy structural steel; the exact material definition depends on the cited gb/t product標

Open grade report →

S235J2 · 1.0117

hot-rolled non-alloy structural steel with specified impact toughness

Open grade report →

S235JR · 1.0038

hot-rolled non-alloy structural steel

Open grade report →

S275J2 · 1.0145

hot-rolled non-alloy structural steel, j2 impact quality

Open grade report →

S275JR · 1.0044

hot-rolled non-alloy quality structural steel

Open grade report →

S355J0 · 1.0553

hot-rolled non-alloy structural steel

Open grade report →

S355J2 · 1.0577

hot-rolled non-alloy structural steel with specified impact toughness

Open grade report →

S355J2H · 1.0576

non-alloy structural steel for hollow sections

Open grade report →

S355JR · 1.0045

hot-rolled non-alloy structural steel

Open grade report →

S355K2 · 1.0596

hot-rolled non-alloy quality structural steel with specified notch toughness

Open grade report →

S355ML · 1.8834

thermomechanically rolled weldable fine-grain structural steel

Open grade report →

S355NL · 1.0546

normalized or normalized-rolled weldable fine-grain structural steel; alloy quality steel under en 10020

Open grade report →

S420ML · 1.8836

thermomechanically rolled weldable fine-grain structural steel

Open grade report →

S420NL · 1.8912

weldable fine-grain structural steel for low-temperature service

Open grade report →

S450J0 · 1.0590

hot-rolled non-alloy high-strength structural steel

Open grade report →

S460ML · 1.8838

thermomechanically rolled weldable fine-grain structural steel

Open grade report →

S460MLO · 1.8878

high-strength weldable fine-grain structural steel for fixed offshore structures

Open grade report →

S460NL · 1.8903

high-strength weldable fine-grain structural steel; alloy special steel

Open grade report →

S690QL · 1.8928

high-yield-strength, fine-grain alloy structural steel, quenched and tempered

Open grade report →

S890QL · 1.8983

high-yield-strength alloy special structural steel, quenched and tempered

Open grade report →

S960QL · 1.8933

ultra-high-strength alloy special structural steel, quenched and tempered, fine grained

Open grade report →

SBHS500

high-yield-strength, weldable structural steel plate for bridges

Open grade report →

SM400A

hot-rolled carbon-manganese structural steel for welded structures

Open grade report →

SM400B

weldable hot-rolled carbon-manganese structural steel

Open grade report →

SM490A

weldable hot-rolled structural carbon-manganese steel, 490 mpa tensile-strength class

Open grade report →

SM490B

weldable 490 mpa-class carbon-manganese structural steel

Open grade report →

SM490YA

hot-rolled weldable structural steel; 490 mpa tensile-strength class with enhanced yield strength

Open grade report →

SM490YB

higher-yield weldable structural steel

Open grade report →

SM520B

high-strength weldable hot-rolled structural steel

Open grade report →

SM570

high-strength weldable structural steel

Open grade report →

SN400B

hot-rolled carbon-manganese structural steel for building construction

Open grade report →

SN490B

weldable 490 mpa-class hot-rolled structural steel for building construction

Open grade report →

SPV355

weldable carbon-manganese pressure-vessel steel plate

Open grade report →

SPV490

high-strength weldable steel plate for pressure vessels and high-pressure equipment

Open grade report →

SS400

general-purpose hot-rolled structural carbon steel

Open grade report →

Type 316 · UNS S31600

molybdenum-alloyed austenitic stainless steel

Open grade report →

Type 321 · UNS S32100

titanium-stabilized austenitic chromium-nickel stainless steel

Open grade report →

Type 347 · UNS S34700

niobium-stabilized chromium-nickel austenitic stainless steel

Open grade report →

Type 410 · UNS S41000

hardenable martensitic stainless steel

Open grade report →

Type 430 · UNS S43000

ferritic chromium stainless steel

Open grade report →

X153CrMoV12 · 1.2379

high-carbon, high-chromium alloy cold-work tool steel

Open grade report →

X2CrNi18-9 · 1.4307

low-carbon chromium-nickel austenitic stainless steel

Open grade report →

X2CrNiMo17-12-2 · 1.4404

low-carbon molybdenum-alloyed austenitic corrosion-resistant stainless steel

Open grade report →

X2CrNiMoN22-5-3 · 1.4462

standard duplex (austenitic-ferritic) corrosion-resistant stainless steel

Open grade report →

X2CrNiMoN25-7-4 · 1.4410

nitrogen-alloyed super duplex (austenitic-ferritic) corrosion-resistant stainless steel

Open grade report →

X2CrNiN23-4 · 1.4362

lean duplex (austenitic-ferritic) corrosion-resistant stainless steel

Open grade report →

X5CrNi18-10 · 1.4301

austenitic chromium-nickel corrosion-resistant stainless steel

Open grade report →

X6CrNiMoTi17-12-2 · 1.4571

titanium-stabilized molybdenum-alloyed austenitic stainless steel

Open grade report →