Supra 316L/4435
Outokumpu lists this as a 316L alternative with higher molybdenum and nickel content than 316L/4404. Do not select it solely from a generic 316L request.
- Material family
- Austenitic stainless steel
- Search designations
- 316L · 1.4435
- Verification scope
- Manufacturer-source identification check only. No standard-compliance or numerical-property verification.
- Last source check
- 2026-09-20
Before specifying this material
- Confirm the product standard, edition, dimensions and delivery condition before purchase.
- Aliases help locate candidates; they are not a declaration of full equivalence.
- Numerical properties have not been curated for this record. No universal strength or chemistry values are implied.
Governing standard/part/edition, product form, heat treatment, dimensions and supplementary requirements have not been selected. No numerical chemistry, yield, tensile, elongation, impact or carbon-equivalent requirements are asserted by this identification record.
Original sources
Outokumpu Supra range ↗
English · checked 2026-09-20
