ASTM A515 Grade 65

Killed carbon-silicon pressure-vessel steel plate for intermediate- and higher-temperature service · ASTM A515/A515M-17 (Reapproved 2022) — product specification · ASTM A20/A20M-20 — general requirements for pressure-vessel plate · ASME SA-515/SA-515M — related ASME BPVC material specification when adopted by the governing Code edition

ASTM A515 Grade 65 is a killed, coarse-grain carbon-silicon plate grade with 450–585 MPa tensile strength, intended principally for welded boilers and pressure vessels in intermediate- and higher-temperature service. Its defining practical limitations are the absence of mandatory impact-toughness requirements, relatively high permitted carbon content, and mandatory normalizing only above 50 mm thickness. Material selection therefore requires attention to actual heat chemistry, weldability, heat-treatment condition, construction-code approval, and any project-specific toughness or nondestructive-examination requirements.

Overview

Designation system
ASTM grade designation; Grade 65 is the inch-pound designation and Grade 450 is the corresponding SI designation
Product forms
Rolled steel plate, Finished plate processed from coil
Condition
As rolled, normally for thicknesses 50 mm [2 in.] and under, Normalized, optional at 50 mm [2 in.] and under, Normalized, mandatory over 50 mm [2 in.], Stress relieved when ordered, Normalized and stress relieved when ordered or required by fabrication rules
Density
7.85 g/cm³ (Representative density for carbon steel; not a specified ASTM A515/A515M acceptance requirement.)

What the designation defines

ASTM A515/A515M covers carbon-silicon steel plate primarily for intermediate- and higher-temperature service in welded boilers and other pressure vessels. Grade 65 identifies the strength level in the inch-pound system; Grade 450 is the SI designation within the same dual-unit specification. It does not denote a 65 ksi yield strength: the specified minimum yield strength is 35 ksi [240 MPa], while 65 ksi [450 MPa] is the lower limit of tensile strength.

The product specification must be used with ASTM A20/A20M, which supplies the common requirements for pressure-vessel plate, including ordering information, testing and retesting, dimensional tolerances, workmanship, defect repair, marking and certification. If the two specifications conflict, A515/A515M takes precedence. Plate cut from coil is not qualified until the responsible processor has completed the required leveling, cutting, testing, inspection, heat treatment where applicable, marking and certification.

ASTM and ASTM M values are separately standard. Do not mix converted inch-pound and SI requirements when determining compliance.

Composition and metallurgical character

Grade 65 [Grade 450] chemical requirements
ElementThickness or analysis basisRequirement, mass %
Carbon, maximum25 mm [1 in.] and under0.28
Carbon, maximumOver 25 to 50 mm [1 to 2 in.], inclusive0.31
Carbon, maximumOver 50 to 100 mm [2 to 4 in.], inclusive0.33
Carbon, maximumOver 100 to 200 mm [4 to 8 in.], inclusive0.33
Carbon, maximumOver 200 mm [8 in.]0.33
Manganese, maximumHeat analysis0.90
Manganese, maximumProduct analysis0.98
Phosphorus, maximumHeat and product analyses0.025
Sulfur, maximumHeat and product analyses0.025
SiliconHeat analysis0.15–0.40
SiliconProduct analysis0.13–0.45

For each 0.01 percentage-point reduction below the applicable maximum carbon content, manganese may be increased by 0.06 percentage point above its stated maximum, up to 1.50% by heat analysis and 1.60% by product analysis.

The steel must be killed and produced to a coarse austenitic grain-size practice. The composition is characteristic of an older elevated-temperature carbon-steel plate concept: silicon provides deoxidation, while the permitted carbon content rises with thickness to assist strength attainment. The permitted carbon level can be significant from a welding and toughness perspective, particularly in thick or highly restrained fabrication.

The standard does not impose a maximum carbon equivalent and does not comprehensively limit common residual alloying elements. A weldability assessment should therefore use the actual material certificate rather than derive a universal carbon-equivalent value from the grade limits alone.

Delivery condition and thickness

Heat-treatment requirements
Nominal plate thicknessNormal ASTM delivery conditionAvailable or required treatment
50 mm [2 in.] and underNormally as rolledMay be ordered normalized, stress relieved, or both
Over 50 mm [2 in.]NormalizedNormalizing is mandatory; subsequent stress relief may also be specified or required

A stress-relieved mill delivery condition does not by itself replace any postweld heat treatment required after fabrication by the construction code, design specification or qualified welding procedure.

The current specification does not establish a single universal maximum plate thickness. Thickness is limited by the producer's ability to satisfy the applicable composition and mechanical-property requirements. Availability at large thickness should not be assumed, and the purchaser should confirm mill capability, heat-treatment facilities, test locations and any additional through-thickness or ultrasonic requirements.

Normalizing refines and homogenizes the rolled microstructure and can improve property consistency, but normalized A515 Grade 65 still does not acquire a specification-level impact-toughness guarantee unless impact testing and acceptance criteria are separately invoked.

Mechanical-property requirements

Room-temperature tensile requirements
PropertyASTM A515 Grade 65ASTM A515M Grade 450
Tensile strength65–85 ksi450–585 MPa
Yield strength, minimum35 ksi240 MPa
Elongation in 8 in. [200 mm], minimum19%19%
Elongation in 2 in. [50 mm], minimum23%23%

ASTM A20/A20M contains the applicable elongation adjustments and determines which specimen and gauge length apply. The two elongation values should not be interpreted as simultaneous requirements for every plate.

These are acceptance properties measured on specified tension-test specimens, not design allowable stresses and not guaranteed properties throughout every location in a plate. Elevated-temperature allowable stress, modulus and related design data must be taken from the governing construction code for the exact material designation, product form, temperature and code edition.

Hardness, Charpy impact energy, fracture toughness, fatigue strength, creep strength and through-thickness ductility are not defined by the basic A515 Grade 65 requirements. Do not assign generic handbook or supplier values as specification guarantees.

Service selection and toughness

The phrase “intermediate- and higher-temperature service” describes the intended field of use; it does not establish a permissible operating-temperature range. A515 Grade 65 is a plain carbon pressure-vessel steel rather than a creep-strengthened chromium-molybdenum alloy. The design temperature and allowable stress must be checked against the applicable boiler or pressure-vessel code, including any restrictions arising from thickness, heat treatment, welded construction, minimum design metal temperature and postweld heat treatment.

The principal selection concern is notch toughness. The base specification contains no mandatory Charpy V-notch test, and its coarse-grain practice does not make it the default choice for low-temperature or impact-sensitive service. Where brittle-fracture resistance matters, the design rules must be used to establish whether impact testing is required, whether an exemption applies, and what test temperature, specimen orientation, energy criteria and heat-treatment condition are acceptable.

A515 Grade 65 versus A516 Grade 65
IssueA515 Grade 65A516 Grade 65
Primary specification intentIntermediate- and higher-temperature boiler and pressure-vessel serviceModerate- and lower-temperature pressure-vessel service where improved notch toughness is important
Grain-size conceptKilled, coarse austenitic grain-size practiceDifferent metallurgical specification directed toward improved notch toughness
Strength class450–585 MPa tensile; 240 MPa minimum yieldSimilar nominal tensile-strength class, subject to its own current specification requirements
InterchangeabilityNot establishedNot established

Similar grade numbers or strength ranges do not make A515 and A516 interchangeable. Substitution requires review of the product specification, chemistry, heat treatment, toughness, code listing, certification and project requirements.

Welding, forming and thermal processing

A515 Grade 65 is intended for fusion-welded construction, but this is conditional on use of a welding procedure suitable for the actual plate and service. The WPS and supporting qualification should address certified chemistry, thickness, joint restraint, heat input, consumable hydrogen control, preheat and interpass temperatures, required toughness, and any postweld heat treatment. The relatively high permitted carbon content means that controls suitable for a lower-carbon pressure-vessel plate should not be transferred automatically.

Cold forming increases strain and may reduce ductility or toughness locally. Hot forming can alter or replace the original normalized condition depending on forming temperature and cooling practice. Forming procedures and any required re-normalizing or post-form heat treatment should therefore follow the governing construction code and qualified fabrication procedure rather than assumptions based solely on the original mill condition.

When severe postweld heat-treatment cycles are anticipated, the purchaser should consider whether mechanical testing after a simulated fabrication heat-treatment cycle is needed. Mechanical properties certified only in the mill delivery condition do not demonstrate retention of strength and toughness after multiple or prolonged fabrication heat treatments.

Inspection and supplementary requirements

The base product specification requires chemical and tensile compliance but does not automatically require ultrasonic examination or notch-toughness testing. ASTM A20/A20M provides supplementary mechanisms for additional control and testing, while ASTM A435/A435M, A577/A577M and A578/A578M are referenced ultrasonic-examination standards. The appropriate method, examination level, scanned area, acceptance class and treatment of edge zones must be stated in the order; a request for “UT tested plate” alone is incomplete.

Additional requirements may be necessary for impact testing, product analysis, simulated postweld heat treatment, extra tension tests, vacuum treatment, through-thickness properties, restricted chemistry or repair control. Such requirements apply only when properly invoked by the purchase order, project specification or construction code and accepted by the supplier.

Specifying and purchasing the plate

Essential ordering decisions
Item to specifyWhy it matters
Specification and editionControls the exact technical requirements and avoids reliance on an unspecified historical edition.
ASTM A515 Grade 65 or A515M Grade 450Establishes the governing unit system; ASTM prohibits mixing the two systems for compliance.
ASME SA-515/SA-515M when Code construction requires itASTM material should not automatically be represented as ASME Code material.
Dimensions, quantity and A20/A20M tolerancesDefines plate size, thickness basis, mass and permissible dimensional variation.
Required delivery conditionAs-rolled, normalized, stress relieved, or normalized and stress relieved condition affects testing and fabrication.
Plate-manufacturing routeFinished plate processed from coil carries additional processing, testing and reporting provisions.
Impact-test requirementsThe base specification provides no mandatory impact value or test temperature.
Ultrasonic examinationThe method, acceptance level, coverage and applicable ASTM examination standard must be identified.
Fabrication heat-treatment simulationUseful when long or repeated PWHT cycles could change tensile or toughness properties.
Additional chemistry or carbon-equivalent controlsMay be required for weldability but are not part of the base grade definition.
Certification and traceabilityThe material test report should identify heat, plate, chemistry, tensile results, heat treatment and invoked supplementary requirements.

Before substitution or release for fabrication, verify the marking and material certificate against the design material specification, construction-code edition, thickness, heat-treatment condition and all supplementary requirements. Matching “Grade 65” strength alone is insufficient.