MetalMate
← Metal Grade Guide

ASTM A572 Grade 60

High-strength low-alloy (HSLA) structural steel · ASTM A572/A572M-25 — High-Strength Low-Alloy Columbium-Vanadium Structural Steel · ASTM A6/A6M-26a — General requirements for rolled structural steel bars, plates, shapes, and sheet piling

ASTM A572 Grade 60 is a microalloyed HSLA structural steel specified by a minimum yield point of 60 ksi [415 MPa] and minimum tensile strength of 75 ksi [520 MPa]. It covers several rolled product forms, but dimensional limits, elongation rules, toughness requirements, availability, and bridge-use restrictions must be checked for the actual product. It is not a weathering grade, does not include a general Charpy toughness guarantee, and should not be treated as interchangeable with A992, A588, A709, or other nominally similar steels without a specification-level review.

Overview

Designation system
ASTM grade designation based on minimum yield point: 60 ksi [415 MPa]
Product forms
Structural plates, Structural bars, Hot-rolled structural shapes, Sheet piling, Zees, Rolled tees
Condition
Killed steel, Hot-rolled structural product as furnished under ASTM A572/A572M and ASTM A6/A6M, Finished structural products processed from coil, subject to the additional ASTM A6/A6M requirements
Density
7850 kg/m³ (Representative engineering value for carbon and low-alloy structural steel; density is not a grade-defining ASTM A572 requirement.)

What the designation controls

The designation combines a product specification and a strength grade. ASTM A572/A572M defines the steel chemistry, mandatory microalloy system, tensile requirements, permitted product forms, and maximum dimensions. ASTM A6/A6M supplies the general rules for ordering, dimensions and tolerances, testing, inspection, repair, marking, certification, and products processed from coil. Grade 60 means a minimum yield point of 60 ksi in the inch-pound system or 415 MPa in the SI system; ASTM requires each unit system to be used independently rather than mixing converted values.

Grade 60 product coverage under ASTM A572/A572M-25
Product formMaximum applicable dimensionPractical interpretation
Plates and bars2.5 in. [64 mm] thickness or applicable section dimensionRound bars may be furnished through 3.5 in. [90 mm] diameter under the table exception.
Structural shapes2.5 in. [64 mm] flange or leg thicknessThe 2025 revision increased the former 2 in. [50 mm] Grade 60 shape limit.
Sheet pilingAll sizes covered by the product specificationCommercial availability still requires confirmation.
Zees and rolled teesAll sizes covered by the product specificationThe absence of a grade-table limit does not establish that every section is routinely produced.

These are specification limits, not a statement of mill or service-center availability.

Coils themselves are not qualified to ASTM A572. Qualification applies after a processor converts a coil into finished structural products and performs the testing, inspection, marking, and certification required by ASTM A6/A6M.

Mechanical requirements and their applicability

Mandatory room-temperature tensile requirements
PropertyASTM requirementImportant qualification
Yield point60 ksi [415 MPa] minimumReported from the applicable ASTM A6/A6M tension-test specimen and orientation.
Tensile strength75 ksi [520 MPa] minimumNo general maximum tensile strength or maximum yield-to-tensile ratio is specified by ASTM A572 Grade 60.
Elongation in 8 in. [200 mm]16% minimumFor plates wider than 24 in. [600 mm], reduce the Grade 60 requirement by three percentage points.
Elongation in 2 in. [50 mm]18% minimumFor plates wider than 24 in. [600 mm], reduce the requirement by three percentage points. Wide-flange shapes over 426 lb/ft [634 kg/m] instead have a 19% minimum in 2 in. [50 mm].
Floor plate elongationNot required to be determinedOther applicable tensile requirements still depend on how the floor plate is ordered.

The standard gives specification minima, not typical design curves or guaranteed values at elevated or subzero temperatures.

The grade does not establish elastic modulus, Poisson’s ratio, thermal expansion, fatigue resistance, through-thickness ductility, fracture toughness, elevated-temperature strength, or fire-design properties. Values used for those purposes normally come from the governing design code, project testing, or product-specific qualification—not from the Grade 60 designation itself. Actual mill yield strength can exceed 60 ksi, and this should not be interpreted as qualification to another grade unless the material is certified to that specification.

Chemistry and strengthening mechanism

Grade 60 heat-analysis limits
ElementRequirementQualification
Carbon0.26% maximumA relatively broad grade limit; the actual heat chemistry is important when developing welding procedures.
Manganese1.35% maximumFor each 0.01 percentage point reduction below the carbon maximum, manganese may increase by 0.06 percentage point, to 1.60% maximum.
Manganese minimum0.80% for plate over 3/8 in. [10 mm]; 0.50% for thinner plate and other productsHeat-analysis values; corresponding product-analysis minima are 0.75% and 0.45%. Mn:C must be at least 2:1.
Phosphorus0.030% maximumUp to 0.040% is permitted for structural shapes, sheet piling, bars, and plates no more than 15 in. [380 mm] wide.
Sulfur0.030% maximumUp to 0.050% is permitted for structural shapes, sheet piling, bars, and plates no more than 15 in. [380 mm] wide.
Silicon0.40% maximum for plate through 1.5 in. [40 mm] and the other listed Grade 60 products; 0.15–0.40% for thicker plateThe thicker-plate range applies where the Grade 60 plate dimensional limit permits it.
Copper when specified0.20% minimum by heat analysis0.18% minimum by product analysis; specifying copper does not turn A572 into a weathering-steel specification.

These values describe heat-analysis requirements. Product analysis is governed by the applicable ASTM tolerances.

Permitted microalloy systems
ASTM typeRequired alloy systemHeat-analysis limits
Type 1Niobium (columbium)0.005–0.050% Nb
Type 2Vanadium0.01–0.15% V
Type 3Niobium plus vanadiumNb 0.005–0.050%; V 0.01–0.15%; Nb + V 0.02–0.15%
Type 5Titanium, nitrogen, and vanadiumTi 0.006–0.040%; N 0.003–0.015%; V 0.06% maximum

The producer normally selects the permitted type. The applicable alloying elements must be reported on the test report; a purchaser needing a particular alloy route must state that requirement using the relevant supplementary provision.

Grade 60 strength is developed through controlled composition, grain refinement, precipitation strengthening, and rolling practice rather than through the quench-and-temper route associated with ASTM A514. The specification permits different microalloy strategies, so two compliant heats can have different detailed chemistries, carbon equivalents, weldability behavior, and forming response while meeting the same Grade 60 tensile requirements.

Toughness and bridge use require explicit attention

ASTM A572 Grade 60 does not carry a universal Charpy V-notch requirement. If brittle-fracture resistance matters because of low service temperature, dynamic loading, thick sections, stress concentration, restraint, critical tensile details, or fracture-critical service, the purchase documents must define the required impact energy, test temperature, specimen orientation, test location, frequency, and applicable supplementary requirement. A generic request for “impact tested” steel is not technically complete.

Application distinction
ApplicationASTM A572 Grade 60 positionEngineering consequence
Buildings and other non-bridge structuresPermitted for riveted, bolted, or welded constructionWelding must follow a procedure suitable for the grade, product, thickness, and service.
Bridge construction—riveted or boltedWithin the stated Grade 60 scopeThe project may nevertheless require a bridge-specific material specification and toughness controls.
Bridge construction—weldedNot included in ASTM A572’s stated Grade 60 bridge intentUse the material and welding specifications required by the bridge owner and governing design code; ASTM A709/A709M or AASHTO M 270 and the bridge welding code commonly control U.S. bridge work.

A572 certification alone should not be assumed to satisfy bridge-zone, fracture-critical, CVN, or welding-code requirements.

Fabrication implications

A572 Grade 60 is weldable when an appropriate procedure is used, but the designation does not provide a maximum carbon equivalent. Welding procedure selection should therefore use the actual mill test report chemistry together with thickness, joint restraint, hydrogen level, heat input, service temperature, applicable AWS code, and any toughness requirement. Preheat and interpass temperature should not be copied from Grade 50 practice without checking the governing code and the actual material.

The higher strength relative to A36 or A572 Grade 50 can increase forming loads and springback and may reduce forming margins. ASTM A572 does not create a universal minimum bend radius for every product, thickness, rolling direction, edge condition, and forming process. Severe cold forming, tight-radius bending, flame straightening, hot forming, or postweld heat treatment should be qualified for the actual product and application, particularly where toughness or strength retention is critical.

Do not infer atmospheric-corrosion resistance from the HSLA classification. Uncoated A572 Grade 60 generally requires the corrosion-protection system appropriate to the environment unless a separate corrosion-resistant material requirement is established.

Specifying and receiving the material

Purchase-order and document checks
Item to define or verifyWhy it matters
ASTM A572/A572M edition and Grade 60Product limits can change between editions; the 2025 edition expanded the Grade 60 shape thickness limit.
Unit systemASTM treats inch-pound and SI requirements as separate systems.
Product form, dimensions, quantity, and finished-coil statusRequirements and testing depend on whether the item is plate, bar, shape, piling, tee, zee, or a finished product processed from coil.
Required ASTM A6/A6M edition and supplementary requirementsControls general delivery, tolerances, testing, certification, marking, and optional requirements.
CVN or other toughness criteriaToughness is not automatically included in the base Grade 60 requirements.
Welding and service requirementsThese may drive chemistry reporting, carbon-equivalent evaluation, preheat, filler-metal selection, and testing.
Copper requirement, if anyCopper is only subject to a minimum when specifically ordered; it does not establish A588-type weathering performance.
Microalloy type, only if technically necessaryThe producer otherwise chooses among the permitted alloy systems.
Material test reportVerify heat identity, grade, product, dimensions, heat and product analyses where applicable, microalloy content, tensile results, and ordered supplementary tests.
Availability before final specificationGrade 60 is less routinely stocked than common Grade 50 plate and A992 wide-flange shapes in many U.S. supply channels.

Positive identification should follow the markings, tags, heat numbers, and certificates required by ASTM A6/A6M. A higher-than-expected tensile result, an informal color code, or a supplier’s verbal statement is not a substitute for traceable certification. Multi-certified material is acceptable only when the certificate demonstrates compliance with every specification and grade claimed and those specifications satisfy the project requirements.

Substitution boundaries

Substitution requires more than matching or exceeding 60 ksi yield strength. Review product-form coverage, dimensional limits, strength range, yield-to-tensile behavior, chemistry and carbon equivalent, microalloy route, toughness, manufacturing process, tolerances, weldability, certification, and the governing design and fabrication codes. There is no universal EN or other cross-standard grade that is automatically interchangeable with ASTM A572 Grade 60.

Sources

ASK METALMATE

Ask MetalMate about ASTM A572 Grade 60

Discussing: ASTM A572 Grade 60

AI assistant · Responses are generated and can contain errors; verify specifications before acting.