MetalMate
← Metal Grade Guide

Q345R

Manganese-alloyed pressure-equipment steel plate and strip · GB/T 713.2-2023 — Steel plate, sheet and strip for pressure equipment, Part 2: Non-alloy and alloy steel with specified temperature properties · GB/T 713.1-2023 — General requirements for pressure-equipment plate, sheet and strip

Q345R is a weldable manganese pressure-equipment steel whose current material requirements are defined by GB/T 713.1 and GB/T 713.2. The nominal 345 MPa yield level applies only through 16 mm; strength, impact requirements and design-use conditions vary with thickness. The purchase specification must identify the delivery condition and any required ultrasonic examination, lower-temperature impact test, through-thickness properties, HIC testing or elevated-temperature tensile testing.

Overview

Designation system
Chinese GB designation based on minimum yield strength and pressure-vessel application
Product forms
Single-rolled plate, 3–250 mm, Hot-rolled strip and cut-to-length plate from coil, up to 25.4 mm
Condition
Hot rolled, Normalized rolled, Normalized, Normalized and tempered
Density
7.85 g/cm³ (Conventional density used for calculating steel-plate mass; not a grade-specific acceptance property.)

Designation and governing standard

In Q345R, “Q” identifies yield strength, “345” is the specified minimum yield strength in MPa for the thinnest plate range, and “R” identifies steel for pressure vessels or pressure equipment. It is a standardized grade, not a trade name. It should be ordered to the current two-part system: GB/T 713.1 supplies the general manufacturing, dimensional, inspection and certification provisions, while GB/T 713.2 contains the grade-specific chemistry, delivery conditions and mechanical requirements.

A drawing or purchase order that states only “GB/T 713” should be clarified. For new procurement, identify GB/T 713.2-2023 and Q345R, together with the applicable general requirements of GB/T 713.1-2023.

Chemical composition

Ladle analysis limits under GB/T 713.2-2023
ElementRequirement, mass %Technical significance
C≤0.20May be increased to ≤0.22 for plate over 60 mm.
Si≤0.55Deoxidizing and strengthening element.
Mn1.20–1.70Principal alloying and strength contribution.
P≤0.025Controlled because of adverse effects on toughness and segregation.
S≤0.010Controlled for cleanliness, toughness and through-thickness performance.
Cu≤0.30Residual-element limit.
Ni≤0.30Residual-element limit.
Cr≤0.30Residual-element limit.
Mo≤0.08Residual-element limit.
Nb≤0.050May be intentionally added as a microalloying element.
V≤0.050May be intentionally added as a microalloying element.
Ti≤0.030May be intentionally added as a microalloying element.
Nb + V + Ti≤0.120Total microalloy content limit for Q345R.
Cu + Ni + Cr + Mo≤0.70Combined residual-element limit.
Total aluminiumNo specified Q345R limitUnlike the previous GB 713-2014 composition table, the 2023 Q345R row does not specify a minimum aluminium content.

Nb, V and Ti contents are to be reported on the quality certificate when added. Product-analysis tolerances are governed by GB/T 713.1.

GB/T 713.2 permits a carbon-equivalent requirement to be added for Q345R at the purchaser's request, but it does not impose one universal carbon-equivalent limit. Weldability assessments should therefore use the actual heat analysis and the carbon-equivalent definition specified by the project, rather than assuming a generic value from the grade name.

Room-temperature mechanical and impact requirements

Specified properties by nominal thickness
Nominal thickness t, mmTensile strength Rm, MPaMinimum yield strength, MPaMinimum elongation, %Charpy V-notch at 0 °C, minimum J
3 ≤ t ≤ 16510–6403452134
16 < t ≤ 36500–6303252141
36 < t ≤ 60490–6203152141
60 < t ≤ 100490–6203052041
100 < t ≤ 150480–6102852041
150 < t ≤ 250470–6002652040

Yield is reported as lower yield strength ReL or, where a distinct yield phenomenon is absent, 0.2% proof strength Rp0.2. Impact values are average requirements subject to the standard's individual-value and reduced-size specimen provisions.

The designation must not be interpreted as guaranteeing 345 MPa yield strength at every thickness. The fall in specified yield and tensile strength through the thickness ranges is important for design calculations, material comparison and substitution. Plate thickness also affects impact specimen availability: very thin plate cannot automatically be represented by a full-size 10 mm Charpy specimen, and the applicable thin-product provisions must be checked.

Bend-test requirement
ThicknessTestMandrel diameter D
t ≤ 16 mm180° bend2a
t > 16 mm180° bend3a

a is specimen thickness. For plate over 60 mm, omission of the bend test is permitted only by supplier-purchaser agreement and when stated in the contract.

Delivery condition and pressure-vessel use

GB/T 713.2 permits Q345R in the hot-rolled, normalized-rolled, normalized, or normalized-and-tempered condition. These alternatives are not interchangeable in every pressure-vessel application. The material purchase condition must be coordinated with the design code, component thickness, forming route and any subsequent heat treatment.

Important use-condition rules in GB/T 150.2-2024
ApplicationRequired use condition
Inner shell of a multilayer vesselQ345R is to be used normalized.
Vessel shell with thickness over 36 mmQ345R is to be used normalized.
Other pressure parts such as flanges, tubesheets and flat heads over 60 mmQ345R is to be used normalized.
Q345R plate over 50 mmNormalized and tempered condition may be used instead of normalized where permitted by the code.

These are pressure-vessel design-code requirements, not changes to the delivery-condition options listed in GB/T 713.2. Other construction codes or project specifications may impose different rules.

The −20 °C stated in the scope of GB/T 713.2 is not a blanket minimum design-metal temperature for every Q345R component. Applicable temperature limits depend on thickness, impact-test condition, stress state, heat treatment and the governing equipment code.

Specified elevated-temperature strength

For plate over 20 mm, elevated-temperature tensile testing may be ordered. The test temperature must be stated in the contract. These material-test values are not allowable stresses; allowable stress is established separately by the governing pressure-equipment design code.

Minimum ReL or Rp0.2 when elevated-temperature testing is ordered
Thickness, mm200 °C250 °C300 °C350 °C400 °C450 °C
>20–36255235215200190180
>36–60240220200185175165
>60–100225205185175165155
>100–150220200180170160150
>150–250215195175165155145

These are specified elevated-temperature yield/proof-strength minima associated with optional testing under the material standard. They should not be substituted for code allowable-stress tables.

Fabrication and welding implications

Q345R is commonly fusion welded, but the grade designation alone does not define a welding procedure. Procedure qualification should account for the actual heat chemistry, plate thickness, joint restraint, hydrogen level, heat input, ambient temperature, required impact toughness and any postweld heat treatment. Consumables must be selected to satisfy the applicable construction code and the required weld-metal and heat-affected-zone properties, rather than merely to overmatch the room-temperature tensile strength.

Cold or hot forming can alter the as-supplied microstructure and toughness. Where substantial forming or a fabrication heat treatment is planned, the purchaser and fabricator should verify whether the final condition remains compatible with the material certificate, qualified procedure and governing pressure-equipment code. This is especially important for normalized or normalized-and-tempered plate and for fabrication cycles approaching the original tempering temperature.

Q345R is not intrinsically corrosion resistant. Corrosion allowance, lining, cladding, environmental cracking resistance and hydrogen-service qualification are separate engineering decisions.

Inspection and additional requirements

Requirements that must be considered explicitly
ItemBase-standard positionWhat to specify when required
Impact at −20 °CPurchaser option for Q345RState −20 °C Charpy testing; the specified energy remains that of the applicable thickness range.
Ultrasonic examinationAvailable as a purchaser requirementState examination of each plate, NB/T 47013.3 edition, scanning requirements and acceptance grade.
Through-thickness propertiesOptionalState GB/T 5313 and the required Z-quality class where lamellar-tearing resistance is needed.
HIC resistanceAdditional requirementState HIC testing, solution and exposure conditions, specimen orientation and acceptance level under the applicable appendix or project specification.
Drop-weight testOptionalState test temperature and acceptance requirement.
Elevated-temperature tensile testOptional for plate over 20 mmState test temperature and required ReL or Rp0.2.
Carbon equivalentBy purchaser request and agreementState formula, maximum value and whether based on ladle or product analysis.
Additional heat-treatment simulationNot automaticDefine simulated PWHT cycles and post-simulation testing when required by fabrication or project rules.

An instruction such as “Q345R with UT” is incomplete unless the method, examination extent and acceptance grade are stated.

Standard batch acceptance groups plate by designation, heat, thickness, rolling condition and heat-treatment system. For plate over 40 mm, the impact-specimen axis is located at one-quarter thickness. The quality certificate should be checked for the standard edition, grade, heat number, dimensions, delivery condition, ladle analysis, microalloy additions, tensile and impact results, bend result where applicable, and all ordered supplementary examinations.

Procurement checklist

Minimum information for an effective Q345R purchase description
Order fieldRecommended content
Standard and gradeGB/T 713.2-2023 Q345R, applying GB/T 713.1-2023 general requirements
Product form and dimensionsSingle-rolled plate or coil-derived product; thickness, width and length
Dimensional tolerancesRequired thickness-tolerance class, flatness and edge condition
Delivery conditionHot rolled, normalized rolled, normalized, or normalized and tempered, coordinated with the design code
Impact testingTemperature, specimen requirements and any project-specific acceptance rules
Nondestructive examinationUT method, extent and acceptance grade
Special service requirementsHIC, through-thickness, drop-weight, elevated-temperature tensile or other agreed tests
Chemistry controlAny agreed carbon-equivalent, residual-element or tighter composition limit
Fabrication simulationRequired PWHT simulation or additional tests after simulated heat treatment
CertificationQuality certificate containing traceable heat, condition and test results

The applicable pressure-vessel or boiler construction code should be identified separately; compliance with the plate material standard alone does not establish suitability for a particular vessel.

Edition history and substitution cautions

Q345R was retained when GB 713-2014 was reorganized into the GB/T 713 series, but the standard number and some technical details changed. Existing drawings and certificates referencing GB 713-2014 should not automatically be treated as certification to GB/T 713.2-2023. The predecessor 16MnR belongs to withdrawn earlier standards and should be resolved through an engineering review rather than simple renaming.

Appendix comparisons associate Q345R with grades such as ASME SA-516 Grade 70 and EN P355GH/P355NH, but these are approximate counterparts. Their chemistry, thickness ranges, delivery conditions, impact rules, testing frequency, certification and design-code status differ. Substitution requires a clause-by-clause comparison and approval under the governing construction code.

ASME SA/GB 713 appearing in earlier ASME BPVC editions was based on GB 713-2014 with ASME additions. It should not be assumed to be identical to the current GB/T 713.1/713.2 system without checking the specific ASME edition and project requirements.

Sources

ASK METALMATE

Ask MetalMate about Q345R

Discussing: Q345R

AI assistant · Responses are generated and can contain errors; verify specifications before acting.