MetalMate
← Metal Grade Guide

Q355E

Low-alloy high-strength structural steel with specified low-temperature impact toughness · GB/T 1591-2018, High strength low alloy structural steels

Under the current GB/T 1591-2018 designation system, “Q355E” does not fully identify a standard grade: quality class E is available as Q355NE in the normalized/normalizing-rolled condition or Q355ME in the TMCP condition. Both are nominal 355 MPa-class structural steels with Charpy V-notch requirements at −40 °C, but their chemistry, weldability limits, thickness ranges and response to heating differ. Procurement documents should therefore replace bare “Q355E” with the intended complete designation.

Overview

Designation system
Chinese GB/T structural-steel designation system
Product forms
Hot-rolled plate, Hot-rolled strip and cut-to-length plate, Hot-rolled sections, Hot-rolled bars, Steel billets, for chemical composition requirements
Condition
Normalized or normalizing rolled: Q355NE, Thermomechanically processed, including permitted TMCP accelerated-cooling variants: Q355ME

The designation must be clarified first

GB/T 1591-2018 constructs a designation from Q, the specified minimum upper yield strength, the delivery-condition symbol and the quality class. The standard gives examples such as Q355ND. For E-quality Q355 steel, the valid choices are Q355NE and Q355ME; there is no plain as-rolled Q355E grade in the 2018 tables.

Meaning of the possible intended designations
DesignationDelivery conditionQuality-class significancePrincipal consequence
Q355NENormalized or normalizing rolledE-quality Charpy requirements, principally at −40 °CProperties are based on a normalized-type metallurgical condition.
Q355METhermomechanically processed (TMCP)E-quality Charpy requirements, principally at −40 °CLower-carbon, process-controlled steel with distinct composition and weldability limits.
Q355ENot a complete GB/T 1591-2018 designationOften used informally to mean a Q355 steel with E-level toughnessMust be clarified before ordering, certification or substitution.

The “E” suffix defines an impact-test quality class; it does not by itself establish a permissible design temperature or guarantee fracture resistance for a completed structure.

Chemical composition and weldability controls

Principal ladle-analysis limits for the two E-quality options
GradeCSiMnPS
Q355NE≤ 0.16%≤ 0.50%0.90–1.65%≤ 0.025%≤ 0.020%
Q355ME≤ 0.14%≤ 0.50%≤ 1.60%≤ 0.025%≤ 0.020%

Ladle analysis. GB/T 1591 also controls microalloying and residual elements. The complete chemistry table, rather than only these principal elements, must be used for conformity assessment.

Both routes may use niobium, vanadium and titanium for grain refinement and precipitation strengthening. The standard controls these additions and requires appropriate fine-grain practice. Finished-product analysis is performed when required by the purchaser, with permissible deviations governed by GB/T 222.

Maximum carbon equivalent and cracking-susceptibility limits
GradeNominal thickness or diameterMaximum
Q355NE≤ 63 mmCEV 0.43%
Q355NE> 63–250 mmCEV 0.45%
Q355NE> 250–400 mmBy agreement
Q355ME≤ 40 mmCEV 0.39%
Q355ME> 40–63 mmCEV 0.40%
Q355ME> 63–150 mmCEV 0.45%
Q355MEAll tabulated thicknessesPcm 0.20% maximum

For Q355ME, the standard permits Pcm to be used in place of CEV when carbon is not greater than 0.12%; the applicable metric should be stated in the order when it matters.

Carbon equivalent used by GB/T 1591
CEV (%) = C + Mn/6 + (Cr + Mo + V)/5 + (Ni + Cu)/15
Calculated from ladle-analysis mass percentages.
Weld-cracking susceptibility index used by GB/T 1591
Pcm (%) = C + Si/30 + Mn/20 + Cu/20 + Ni/60 + Cr/20 + Mo/15 + V/10 + 5B
Particularly relevant to lower-carbon TMCP steel; it is not a welding-procedure qualification by itself.

Thickness-dependent tensile requirements

Q355NE normalized or normalizing-rolled steel
Nominal thickness or diameterMinimum upper yield strengthTensile strength
≤ 16 mm355 MPa470–630 MPa
> 16–40 mm345 MPa470–630 MPa
> 40–63 mm335 MPa470–630 MPa
> 63–80 mm325 MPa470–630 MPa
> 80–100 mm315 MPa470–630 MPa
> 100–150 mm295 MPa450–600 MPa
> 150–200 mm285 MPa450–600 MPa
> 200–250 mm275 MPa450–600 MPa

Where a distinct yield phenomenon is not present, proof strength Rp0.2 may be used as specified by the standard.

Q355ME thermomechanically processed steel
Nominal thickness or diameterMinimum upper yield strengthTensile strength
≤ 16 mm355 MPa470–630 MPa
> 16–40 mm345 MPa470–630 MPa
> 40–63 mm335 MPa450–610 MPa
> 63–80 mm325 MPa440–600 MPa
> 80–100 mm325 MPa440–600 MPa
> 100–120 mm320 MPa430–590 MPa

The general tabulated range for Q355M extends to 120 mm; special product-form provisions and agreed requirements must be checked before applying values beyond the relevant table range.

The designation number 355 is therefore not a universal yield value for every thickness. Structural calculations, purchase specifications and incoming inspection must use the requirement for the actual product thickness or diameter and delivery condition.

Low-temperature impact toughness

Charpy V-notch requirements for Q355NE and Q355ME, quality class E
Test temperatureLongitudinal minimum KV2Transverse minimum KV2Status
20 °C63 J40 JAssociated E-quality requirement
0 °C55 J34 JAssociated E-quality requirement
−20 °C47 J27 JAssociated E-quality requirement
−40 °C31 J20 JDefining E-quality test temperature
−50 °C27 J16 JOptional when specifically required and agreed

The standard normally uses longitudinal specimens. Transverse specimens may be agreed. Standard 10 mm × 10 mm specimens are used when product dimensions permit; prescribed reductions apply to permitted sub-size specimens.

Impact qualification applies to specimens sampled and tested according to the standard. It does not directly establish the lowest operating temperature of a welded component. Service-temperature selection also depends on section thickness, stress state, weld details, heat-affected-zone toughness, strain rate, flaw tolerance and the applicable design code.

Processing and fabrication implications

Both Q355NE and Q355ME are weldable structural steels, but welding controls should be based on the certified ladle chemistry, CEV or Pcm, thickness, restraint, hydrogen level, heat input and ambient temperature. The grade designation alone is insufficient to select preheat, interpass temperature or consumables.

Q355ME obtains part of its property balance from controlled rolling and cooling. GB/T 1591 cautions that hot forming or post-weld heat treatment above 580 °C may reduce the strength of TMCP steel. Any high-temperature forming, stress relief or extended thermal cycle should therefore be reviewed with the mill and the governing fabrication code before Q355ME is selected.

Cold forming limits, minimum bend radii, flame straightening, welding-procedure qualification and heat-treatment rules are fabrication-specific matters. The standard offers an optional bend test but does not replace the requirements of the applicable structural or fabrication code.

Product form, inspection and ordering

GB/T 1591 covers plate, strip, sections, bars and related structural products, while dimensions, shape, mass and tolerances are referred to the applicable product-form standards. A purchase description must therefore identify both GB/T 1591 and the dimensional or product standard appropriate to the supplied form.

Information that should be fixed in the purchase specification
ItemRecommended requirement
Complete gradeState Q355NE or Q355ME; do not leave the designation as Q355E.
Standard editionGB/T 1591-2018 unless another edition is contractually required.
Product definitionPlate, strip, section or bar; dimensions, tolerances and applicable dimensional standard.
Impact testingE quality, test temperature, longitudinal or transverse orientation and any −50 °C supplementary requirement.
Weldability dataRequire reported ladle chemistry and applicable CEV or Pcm when needed for welding engineering.
CertificationSpecify the required inspection document and traceability to heat and test batch.
Optional testsState any agreed bend test, finished-product analysis, ultrasonic examination or other NDT.
Through-thickness propertiesFor plate requiring Z-direction ductility, add the applicable GB/T 5313 class, such as Z25, to the designation and order.
Surface qualityState any supplementary surface-quality standard or acceptance class needed by the project.

A certificate marked only “Q355E” should be queried. Confirm the actual heat-treatment or rolling condition and verify that the chemistry, tensile and impact results correspond to either Q355NE or Q355ME.

Substitution and cross-standard comparison

GB/T 1591-2018 provides an informative comparison table linking Q355NE with the normalized 355 MPa class and Q355ME with the TMCP 355 MPa class in ISO and European standards. These associations are useful for orientation but do not establish automatic interchangeability. Product form, thickness range, composition, tensile properties, impact energy and orientation, dimensional standards, inspection and certification must be compared before substitution.

Sources

ASK METALMATE

Ask MetalMate about Q355E

Discussing: Q355E

AI assistant · Responses are generated and can contain errors; verify specifications before acting.

Q355E | MetalMate Grade Guide