MetalMate
← Metal Grade Guide

SM570

High-strength weldable structural steel · JIS G 3106:2024 — Rolled steels for welded structure

SM570 is the highest-strength grade in JIS G 3106:2024, specified primarily by 570–720 MPa tensile strength, thickness-dependent yield strength, controlled weldability and 47 J longitudinal Charpy toughness at −5 °C. It is not defined by a single mandatory production route: the ordered product form, thickness, delivery condition, toughness testing and actual heat chemistry must all be confirmed before design, welding or substitution.

Overview

Designation system
JIS grade designation under JIS G 3106
Product forms
Hot-rolled steel plate and sheet, Hot-rolled strip in coil and cut lengths, Rolled structural sections, Hot-rolled flats
Condition
Final delivery condition producing the specified properties, N — normalized by agreement, T — tempered by agreement, Q — quenched and tempered, TMC — thermomechanically controlled by agreement
Density
7850 kg/m³ (Conventional nominal density used for steel mass calculations; not a distinguishing SM570 grade requirement.)

What the designation covers

JIS G 3106 covers hot-rolled steels intended for welded structures such as bridges, ships, rolling stock, storage tanks and fabricated containers. In SM570, “570” identifies the lower limit of the specified tensile-strength range in N/mm². Unlike lower-strength SM grades, SM570 has no A, B or C toughness suffix: the complete current JIS grade symbol is simply SM570. References to “SM570C” in some commercial databases should not be treated as the official JIS designation.

Normal product-form applicability
Product formStandard thickness applicabilityImportant qualification
Plate and sheet≤100 mmPlate/sheet over 100 mm through 150 mm may be supplied only under the special purchaser–manufacturer agreement provisions of Annex JA.
Strip in coil and cut lengths≤100 mmMechanical testing and lot formation follow the strip provisions of JIS G 3106.
Rolled structural sections≤100 mmThickness is taken at the test-piece location. Separate annex requirements apply to small sections.
Hot-rolled flats≤40 mmSeparate annex requirements apply where width is below 40 mm; special provisions may be used for widths from 40 mm to below 50 mm.

SM570 plate above 100 mm is not ordinary catalogue-compliance material. The Annex JA route requires explicit agreement and has separate chemistry and tensile requirements; it should be identified clearly in the purchase specification and inspection document.

Chemical composition and weldability controls

Heat-analysis limits for normal SM570 thicknesses
Applicable thicknessCSiMnPS
≤100 mm≤0.18%≤0.55%≤1.70%≤0.035%≤0.035%

These are heat-analysis requirements. Other alloying elements may be added as necessary and must not be assumed absent.

The five-element composition table does not fully describe the metallurgical design of an SM570 heat. Producers may use Ni, Cr, Mo, Cu, V, Nb, Ti, B or other additions to obtain strength, toughness and process control. The complete analysis is therefore more useful for welding assessment than the basic C–Si–Mn–P–S limits alone.

JIS carbon equivalent
Ceq = C + Mn/6 + Si/24 + Ni/40 + Cr/5 + Mo/4 + V/14
All terms are mass percent. Under JIS G 3106, the SM570 carbon-equivalent requirement applies to quenched-and-tempered products.
SM570 carbon-equivalent limits
ThicknessMaximum Ceq
≤50 mm0.44%
>50 to 100 mm0.47%
>100 mmBy purchaser–manufacturer agreement
JIS weld-crack sensitivity composition
Pcm = C + Si/30 + Mn/20 + Cu/20 + Ni/60 + Cr/20 + Mo/15 + V/10 + 5B
All terms are mass percent. Pcm may be applied in place of Ceq by agreement between purchaser and manufacturer.
SM570 weld-crack sensitivity limits
ThicknessMaximum Pcm
≤50 mm0.28%
>50 to 100 mm0.30%
>100 mmBy purchaser–manufacturer agreement

The specification maxima are acceptance limits, not welding-procedure instructions. Preheat and heat-input decisions must use the actual reported composition together with thickness, joint restraint, consumable hydrogen level, ambient conditions and the qualified welding procedure.

Mechanical-property requirements

Yield or proof strength and tensile strength — normal product range
Nominal thicknessMinimum yield point or proof stressTensile strength
≤16 mm460 MPa570–720 MPa
>16 to 40 mm450 MPa570–720 MPa
>40 to 75 mm430 MPa570–720 MPa
>75 to 100 mm420 MPa570–720 MPa

For sections, nominal thickness is the thickness at the test-piece location.

Elongation requirements
ThicknessJIS tensile specimenMinimum elongation
≤16 mmNo. 519%
>16 to 100 mmNo. 526%
>20 to 100 mmNo. 420%

The applicable specimen is determined by the product geometry and JIS testing provisions. Values obtained from different specimen types should not be compared as though they were the same test.

Charpy V-notch requirement
Applicable materialTemperatureMinimum absorbed energyDirection and acceptance basis
SM570 with thickness >12 mm−5 °C47 JMean of three specimens taken in the rolling direction

A lower test temperature may be specified by purchaser–manufacturer agreement. The standard requirement does not establish toughness at temperatures below the ordered test temperature.

Sections with a leg length below 40 mm and flats below 40 mm wide are governed by the separate mechanical-property requirements of Annex JB. Annex JB may also be applied within specified intermediate size ranges. Do not certify these products solely against the general plate-property table.

Delivery condition and fabrication significance

Condition suffixes recognized by JIS G 3106
SuffixConditionCommercial significance
NNormalized by agreementHeat treatment must be stated as part of the grade marking.
TTempered by agreementConfirm the preceding production route and producer documentation.
QQuenched and temperedCeq requirements are directly relevant; uncontrolled reheating can alter the developed properties.
TMCThermomechanically controlled by agreementConfirm producer restrictions on hot forming, flame straightening and heat input.
Agreed symbolOther agreed heat treatmentThe condition and acceptance basis must be defined in the order.

SM570 is a strength-and-toughness specification, not a unique alloy recipe or mandatory microstructure. Material supplied as Q and material supplied as TMC may meet the same room-temperature tensile requirements while responding differently to welding, hot forming, stress relief or local heating. The delivery condition shown on the inspection certificate is therefore part of the engineering identity of the product.

Welding procedures should control hydrogen, interpass temperature, heat input and hardness or toughness where required by the fabrication code. Consumables must be selected for the required deposited-metal strength and toughness rather than solely by matching the number 570. Procedure qualification should represent the actual product thickness and delivery condition. Repair welding of SM570 plate or sheet requires prior agreement between purchaser and manufacturer under JIS G 3106.

Cold forming, hot forming, flame straightening, post-weld heat treatment and thermal cutting can affect the properties developed by quenching and tempering or thermomechanical processing. Limits should come from the steel producer, applicable fabrication standard and qualified procedure; they are not universal properties of the SM570 designation.

Specifying and accepting an order

Items that should be fixed or verified
ItemWhat to state or checkWhy it matters
Standard editionJIS G 3106:2024Requirements and annex provisions can change between editions.
Designation and conditionSM570 plus N, T, Q, TMC or other applicable condition suffixSM570 alone does not identify the production route.
Product form and dimensionsPlate, sheet, coil, section or flat; nominal thickness and relevant section dimensionsThickness controls yield strength, weldability limits, testing and whether an annex applies.
Impact requirementStandard −5 °C requirement or an agreed lower test temperatureThe standard 47 J value does not demonstrate low-temperature performance below the test temperature.
Chemistry reportingFull heat analysis and the applicable Ceq or Pcm resultRequired for traceability and practical welding assessment.
Inspection documentDocument type, heat number, mechanical tests, impact results and delivery conditionConfirms that the delivered product—not merely the grade name—meets the order.
Additional testingUltrasonic examination, through-thickness properties, transverse impact tests or tighter chemistry where requiredThese are not automatically provided by the basic SM570 designation.
Dimensions and tolerancesApplicable provisions of JIS G 3192, JIS G 3193 or JIS G 3194The correct supporting standard depends on product form.

For fracture-critical, highly restrained, thick-section or low-temperature service, the base designation may be insufficient. Project requirements may need a lower Charpy temperature, minimum individual impact value, transverse testing, maximum Pcm below the JIS limit, ultrasonic quality, through-thickness ductility or producer-specific processing controls. Such requirements must be ordered explicitly rather than inferred from SM570.

Substitution and design interpretation

SM570 should not be substituted solely by matching nominal yield strength. A valid comparison must include product standard, thickness-dependent yield requirement, tensile range, impact temperature and specimen direction, delivery condition, chemistry and weldability controls, dimensional tolerances, testing frequency and certification. European S460 grades and North American 65 ksi-class structural steels may occupy a broadly similar strength range, but none is automatically equivalent to JIS SM570.

The 570 designation is a tensile-strength classification. It should not be interpreted as 570 MPa yield strength or used directly as a design resistance without the applicable structural design standard and thickness category.

Sources

ASK METALMATE

Ask MetalMate about SM570

Discussing: SM570

AI assistant · Responses are generated and can contain errors; verify specifications before acting.