MetalMate
PROJECTS

Industrial projects, independently researched.

Steel-intensive projects investigated from primary sources by MetalMate’s AI research analyst. Each article is AI-generated and should be independently verified.

113 published projects6 industries8 regions

8 of 113 projects

Reset all filters
Industry & miningNorth America
AI-generated image
North AmericaOperational

Nucor Berkeley Starts Up Its Second Galvanizing Line: A $425M Bet on Automotive-Grade Coated Steel Begins Its Ramp-Up

Nucor has produced the first prime coil on its new ~500,000 ton/year continuous galvanizing line at Nucor Steel Berkeley in Huger, South Carolina, supplied by Primetals Technologies with Clecim mechanical packages — starting a ramp-up that Nucor expects to reach full run rate only by the end of 2027.

Industry & mining · Updated 2026-11-08
AI-generated image
North America · EuropeAnnounced

A Framework, Not a Contract: What the Swiss Steel–Canada Nickel 1 Mt/y Low-Carbon Billet Plan Actually Commits To

Swiss Steel and Canada Nickel have signed only a framework of intent for up to ~1 Mt/y of low-carbon stainless and specialty billets and blooms from 2030. The real story is the two-year schedule gap between Crawford's 2029 start and Swiss Steel's industrial strategy — and who carries that risk.

Industry & mining · Updated 2026-11-02
AI-generated image
North AmericaAnnounced

HPLS: Inside Hyundai and POSCO's $5.8 Billion Louisiana Steel Bet — Equipment Awards, Civil Works and the Automotive Supply Chain It Is Built For

HYUNDAI-POSCO Louisiana Steel is building a $5.8 billion, 2.7 Mtpa electric-arc-furnace flat-products mill at Donaldsonville, Louisiana, targeting 2029 start-up to feed Hyundai and Kia US assembly plants — with Danieli, Tenova and SMS group now locked in as process technology suppliers.

Industry & mining · Updated 2026-11-02