Nucor Berkeley Starts Up Its Second Galvanizing Line: A $425M Bet on Automotive-Grade Coated Steel Begins Its Ramp-Up

Nucor has produced the first prime coil on its new ~500,000 ton/year continuous galvanizing line at Nucor Steel Berkeley in Huger, South Carolina, supplied by Primetals Technologies with Clecim mechanical packages — starting a ramp-up that Nucor expects to reach full run rate only by the end of 2027.

Industry & mining · Updated 2026-11-08
AI-generated image
EuropeConstruction / fabrication

Marcegaglia's €1.2bn Fos-sur-Mer EAF: Mistral financing is in place — but the FID still isn't

Marcegaglia has locked in €800m of SACE/Bpifrance-backed sustainability-linked debt and a €450m Danieli equipment contract for its Mistral electric-furnace steel complex at Fos-sur-Mer, but final investment decision, permits and the civil-works/construction-steel packages are all still outstanding ahead of a target 2029 start-up.

Industry & mining · Updated 2026-11-07
AI-generated image
North America · EuropeAnnounced

A Framework, Not a Contract: What the Swiss Steel–Canada Nickel 1 Mt/y Low-Carbon Billet Plan Actually Commits To

Swiss Steel and Canada Nickel have signed only a framework of intent for up to ~1 Mt/y of low-carbon stainless and specialty billets and blooms from 2030. The real story is the two-year schedule gap between Crawford's 2029 start and Swiss Steel's industrial strategy — and who carries that risk.

Industry & mining · Updated 2026-11-02
AI-generated image
GlobalConstruction / fabrication

voestalpine's Donawitz EAF: How a €420 Million Furnace Became the Test Case for Special-Steel Decarbonisation

voestalpine has finished installing the electric arc furnace at its Donawitz special-steel works in Leoben, Austria, and begun cold commissioning — a €420 million conversion that must eventually make railway, wire and tube grades from scrap-heavy feedstocks, with first operation targeted for H1 2027.

Industry & mining · Updated 2026-11-02
AI-generated image
North AmericaAnnounced

HPLS: Inside Hyundai and POSCO's $5.8 Billion Louisiana Steel Bet — Equipment Awards, Civil Works and the Automotive Supply Chain It Is Built For

HYUNDAI-POSCO Louisiana Steel is building a $5.8 billion, 2.7 Mtpa electric-arc-furnace flat-products mill at Donaldsonville, Louisiana, targeting 2029 start-up to feed Hyundai and Kia US assembly plants — with Danieli, Tenova and SMS group now locked in as process technology suppliers.