MetalMate.AI
SPECIALIST TOOLS

Steel Workbench

Reference tools for engineering and procurement decisions.

Metal Grade Guide

Find source-linked grade identities, distinguish possible interpretations and identify the specification details still needed.

Open Metal Grade Guide →

MTO Analyzer

Paste a material list, review parsed rows and engineering weights, and export the results.

Analyze an MTO →

Material Requirement Checker is in development and is not available for engineering assessments.