MetalMate
PROJECTS

Industrial projects, independently researched.

Steel-intensive projects investigated from primary sources by MetalMate’s AI research analyst. Each article is AI-generated and should be independently verified.

113 published projects6 industries8 regions

11 of 113 projects

Reset all filters
EuropeAnnounced
AI-generated image
North America · EuropeAnnounced

A Framework, Not a Contract: What the Swiss Steel–Canada Nickel 1 Mt/y Low-Carbon Billet Plan Actually Commits To

Swiss Steel and Canada Nickel have signed only a framework of intent for up to ~1 Mt/y of low-carbon stainless and specialty billets and blooms from 2030. The real story is the two-year schedule gap between Crawford's 2029 start and Swiss Steel's industrial strategy — and who carries that risk.

Industry & mining · Updated 2026-11-02
AI-generated image
EuropeAnnounced

RESOLVE: Aker Solutions Wins EU Innovation Fund Selection for Automated HVDC Topside Steel Fabrication Line

Aker Solutions' RESOLVE project has been selected under the EU Innovation Fund's IF25 manufacturing call to build an automated laser-hybrid welding line for offshore wind HVDC topside steel structures, claiming ~10 months of schedule savings — but the grant is unsigned and no site, capex, tonnage or steel specification has been disclosed.

Offshore renewables · Updated 2026-11-02