MetalMate
PROJECTS

Industrial projects, independently researched.

Steel-intensive projects investigated from primary sources by MetalMate’s AI research analyst. Each article is AI-generated and should be independently verified.

113 published projects6 industries8 regions

8 of 113 projects

Reset all filters
Industry & miningConstruction / fabrication
AI-generated image
EuropeConstruction / fabrication

Marcegaglia's €1.2bn Fos-sur-Mer EAF: Mistral financing is in place — but the FID still isn't

Marcegaglia has locked in €800m of SACE/Bpifrance-backed sustainability-linked debt and a €450m Danieli equipment contract for its Mistral electric-furnace steel complex at Fos-sur-Mer, but final investment decision, permits and the civil-works/construction-steel packages are all still outstanding ahead of a target 2029 start-up.

Industry & mining · Updated 2026-11-07
AI-generated image
GlobalConstruction / fabrication

voestalpine's Donawitz EAF: How a €420 Million Furnace Became the Test Case for Special-Steel Decarbonisation

voestalpine has finished installing the electric arc furnace at its Donawitz special-steel works in Leoben, Austria, and begun cold commissioning — a €420 million conversion that must eventually make railway, wire and tube grades from scrap-heavy feedstocks, with first operation targeted for H1 2027.

Industry & mining · Updated 2026-11-02