SGS and Carbonix Launch P180 HBI Pilot in Lakefield: A Technology-Qualification Programme, Not Yet a Plant
Carbonix's pre-commercial P180 process — ore polishing, micro-pelletising, fluid-bed hydrogen reduction and iron-catalysed methane pyrolysis in one flowsheet — enters independent evaluation at SGS Lakefield, ending in a Pre-FEED study for a possible demonstration plant.



